Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T19DV07349
Case Details
Entered Date:
09/19/2019
Applicant:
VILLAGOMEZ JOSE A & PETRA CP/RS
Description:
WOP, VIOLATION OF SITE PLAN
Case Violations
Case Number: T19DV07349
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-COMMERCL
Total Violations: 2
Violation Date | Code Statue |
---|---|
09/19/2019 | UDC Sec. 10.2.1. COMPLIANCE REVIEW, PROPOSED DEVELOPMENT No land may be used or occupied; no site improvement, modification, or construction started; no existing use or structure expanded, reconstructed, changed, or otherwise altered; and no land may be divided into multiple parcels until compliance with the provisions of the UDC has been certified through a zoning review process by PDSD. No City agency may issue a permit for excavation, grubbing, grading, paving, demolition, or construction of any sort before certification of compliance with provisions of the UDC has been determined by PDSD. In the event a zoning regulation requires interpretation, such interpretation shall be issued by the Zoning Administrator in accordance with Sections 1.5, Interpretations of the Unified Development Code. |
09/19/2019 | T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe. |
Completed Inspections
Case Status: COMPLIAN
Case Number: T19DV07349
Case Description: WORK WITHOUT PERMITS-COMMERCL
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/18/2019 | INSP - INITIAL CODE ENFORCMENT | LOPEZ | Approved | After further inspection was done, I contacted manager/owner To meet me on the property. he has been back-and-forth with the Department of developmental services has not obtained the proper paperwork for the grading and the stock piling on the property, I advised that I will be issuing notice and would be posting to stop all work until Permits are obtained and gets appoval from D.S.D. |
06/17/2020 | INSP - FOLLOW UP CODE ENFORCE | LOPEZ | Approved | HAS PLAN CK REVIEW IN SYSTEM EXT DATE 9-05-2020 WILL NEED TO MONATOR |
Completed Activity Special Conditions
Case Description - WORK WITHOUT PERMITS-COMMERCL
Case Number - T19DV07349
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 2
Date | Name |
09/19/2019 | CONTACTED BY MAILING |
09/19/2019 | NOTICE OF VIOLATION ISSUED |