Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case Details

Status:

COMPLIAN

Type:

ENVIRONMENTAL
Address:

Entered Date:

07/09/2019

Applicant:

LARRY ROBERT HARDMAN

Description:

Aerosol from Body Shop that is painting with out a paint booth. Affecting 5 houses with evaporative coolers and vehicles

Completed Inspections

Case Status: COMPLIAN
Case Number: T19DV05508
Case Description: ENVIRONMENTAL
Total Completed Inspections - 2
End Date Description Inspector Results Comments
09/11/2019 INSP - INITIAL CODE ENFORCMENT GONZALEZ Approved NO EVIDENCE OF THE BODY SHOP PAINTING ON SITE AT THIS TIME. THERE IS A STRUCTURE IN FRONT OF THE ORIGINAL BUILDING THAT HAS BEEN BUILT WITHOUT PERMITS, IT HAS BOTH WATER AND ELECTRICITY CONNECTED. EXTENSION CORDS SUPPLYING THE UNAPPROVED STRUCTURE HAS BEEN DISCONNECTED, POSTED UNFIT TO OCCUPY WITH THE NOTICE AND ORDER TO KEEP VACANT AND TO REMOVE THE STRUCTURE.
11/19/2019 INSP - FOLLOW UP CODE ENFORCE GONZALEZ Approved ALL STRUCTURES WITHOUT APPROVALS OR PERMITS HAS BEEN REMOVED CLOSING CASE.

Outstanding Case Activity Conditions

Date Name Approved
09/12/2019 T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe. TC CHAPTER 16 SEC 16-65 ABATEMENT BY DEMOLITION SHALL BE ORDERED ONLY WHERE REPAIR OF THE STRUCTURE IS UNREASONABLE OR IMPRACTICABLE, AND DEMOLITION AND REMOVAL OF A STRUCTURE OR BUILDING IS NECESSARY TO CORRECT AND ABATE A VIOLATION. ANY ACTION INVOLVING THE DEMOLITION OF A BUILDING OR STRUCTURE SHALL BE COMMENCED BY ISSUING A NOTICE OF VIOLATION TO THE OWNER AND ANY RESPONSIBLE PARTIES IN ACCORDANCE WITH THE PROVISIONS OF SECTION 16-45. Not Approved

Completed Activity Special Conditions

Case Description - ENVIRONMENTAL
Case Number - T19DV05508
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 4
Date Name
09/11/2019 CONTACTED BY PHONE
09/11/2019 CONTACTED IN PERSON
09/11/2019 NOTICE AND ORDER ISSUED
11/21/2019 VIOLATION CLOSED

Documents

File Name Document Type  
T19DV05508.JPG DOCUMENTS VIEW
2019-09-11-13-11-03_AATSC.JPG DOCUMENTS VIEW
2019-09-11-13-11-09_AATSC.JPG DOCUMENTS VIEW
2019-09-11-13-11-19_AATSC.JPG DOCUMENTS VIEW
2019-09-11-13-11-26_AATSC.JPG DOCUMENTS VIEW
2019-09-11-13-11-31_AATSC.JPG DOCUMENTS VIEW
2019-09-11-13-11-36_AATSC.JPG DOCUMENTS VIEW
2019-09-11-13-11-42_AATSC.JPG DOCUMENTS VIEW
2019-09-11-13-11-50_AATSC.JPG DOCUMENTS VIEW
2019-09-11-13-31-35_AATSC.JPG DOCUMENTS VIEW
2019-09-11-13-37-46_AATSC.JPG DOCUMENTS VIEW
2019-09-11-13-39-30_AATSC.JPG DOCUMENTS VIEW
NOTICE AND ORDER.PDF DOCUMENTS VIEW