Status:

COMPLIAN

Type:

EMERGENCY

Entered Date:

04/19/2019

Applicant:

CONREW LLC ATTN: MARGEAUX BOWERS

Description:

UNIT IS GETTING WATER FROM CEILING FROM UPPER UNIT, COMMUNICATION CALLED FOR #311, E191091056

Completed Inspections

Case Status: COMPLIAN
Case Number: T19DV03122
Case Description: EMERGENCY
Total Completed Inspections - 2
End Date Description Inspector Results Comments
04/19/2019 INSP - INITIAL CODE ENFORCMENT VIDAL Approved The unit has water leaking from the ceiling and was due to leaky water heater and a bathtub the was filled and overflowed and water got on the floor and leaked through the floor. While on site the water did stop leaking due to the floor was drying out and had no water standing. This unit will be check next week for other damage. RV.
08/07/2020 INSP - FOLLOW UP CODE ENFORCE VIDAL Approved All the repairs have been completed and has new tenants. The repairs were also completed on the upper unit that caused the issues to this unit. At this time the case will be closed. Violation Abated, Close Case. RV.

Completed Activity Special Conditions

Case Description - EMERGENCY
Case Number - T19DV03122
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 2
Date Name
04/19/2019 NOTICE OF VIOLATION ISSUED
04/19/2019 STRUCTURE SECURED BY ???