Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T19DV03122
Case Details
Entered Date:
04/19/2019
Applicant:
CONREW LLC ATTN: MARGEAUX BOWERS
Description:
UNIT IS GETTING WATER FROM CEILING FROM UPPER UNIT, COMMUNICATION CALLED FOR #311, E191091056
Completed Inspections
Case Status: COMPLIAN
Case Number: T19DV03122
Case Description: EMERGENCY
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/19/2019 | INSP - INITIAL CODE ENFORCMENT | VIDAL | Approved | The unit has water leaking from the ceiling and was due to leaky water heater and a bathtub the was filled and overflowed and water got on the floor and leaked through the floor. While on site the water did stop leaking due to the floor was drying out and had no water standing. This unit will be check next week for other damage. RV. |
08/07/2020 | INSP - FOLLOW UP CODE ENFORCE | VIDAL | Approved | All the repairs have been completed and has new tenants. The repairs were also completed on the upper unit that caused the issues to this unit. At this time the case will be closed. Violation Abated, Close Case. RV. |
Completed Activity Special Conditions
Case Description - EMERGENCY
Case Number - T19DV03122
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 2
Date | Name |
04/19/2019 | NOTICE OF VIOLATION ISSUED |
04/19/2019 | STRUCTURE SECURED BY ??? |