Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T19DV02721
Case Details
Entered Date:
04/09/2019
Applicant:
IPX 1031 INVESTMENT PROPERTIES FBO MAM
Description:
MEET ON SITE FOR POWER INSPECTION
Completed Inspections
Case Status: COMPLIAN
Case Number: T19DV02721
Case Description: MULTIPLE TYPES
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/08/2019 | INSP - INITIAL CODE ENFORCMENT | VIDAL | Approved | Electrical contractor called to have the owner of the mobile home on site to have the unit checked for the clearance for the electrical. Did remove the plywood from the door opening to allow the owner into the mobile home. The inspector met with the owner of the mobile home and the inspection was done and approved. The electrical will not be allowed to be tuned on due to the power is off at the transformer and needs to get a permit for space #10. The contractor will go and get the permits and call in the inspection. Did leave the plywood off at this time and the owner will place her own lock to have the unit secured. T.E.P. was on site and went over the issues with the pedistal before it can be approved. The posting still in placed and the mobile home is secured. RV. |
05/20/2019 | INSP - FOLLOW UP CODE ENFORCE | VIDAL | Approved | The electrical has been turned back on and at this time the case will be closed. Violation Abated, Close Case. RV. |