Case: T19DV02420
Case Details
Entered Date:
04/01/2019
Applicant:
MILLER DAVID A & JO ANN JT/RS
Description:
CAR INTO RESIDENTIAL BUILDING
Completed Inspections
Case Status: COMPLIAN
Case Number: T19DV02420
Case Description: CAR THROUGH RESIDENTIAL BUILDI
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2019 | INSP - INITIAL CODE ENFORCMENT | GOODMAN | Approved | CONTACTED BY TPD FOR A CAR INTO BUILDIING, INFORMED OFFICER I MAY BE A WHILE AS I WAS AT A INITIAL CALL AND MAY BE A WHILE. I INFORMED OFFICER HE DID NOT NEED TO WAIT FOR BE UNLESS THERE WAS MAJOR DAMAGE. UPON ARRIVAL I FOUND TPD HAD LEFT THE SCENE. MET WITH OWNER DAVID MILLER WHO SHOWED ME HIS FRONT PORCH. CAR HAD HIT THE EAST PORCH POLE, DISPLACED THE POLE AND DAMAGED THE BLOCK FOOTING. OWNER STATED THAT HE HAD BUILT THE HOUSE START TO FINISH AND WOULD LIKE TO MAKE REPAIRS TO THE PORCH. OWNER HAD ALREADY SHORED OF THE PORCH BEAM, REPAIRS WOULD CONSIST OF REPLACING 2 BLOCK, SOLID MORTAR & REBAR, POST BASE AND POST. I HAD NO ISSUES WITH THE OWNER MAKING THE REPAIRS AS THE REPAIRS WERE VERY MINOR. MR MILLER STATED HE COULD BE DONE IN ABOUT 4-5 DAYS. I EXPLAINED I WOULD BE BACK IN A WEEK. |
| 04/06/2019 | INSP - FOLLOW UP CODE ENFORCE | GOODMAN | Approved | REINSPECTED THE STRUCTURE AT REQUEST OF THE OWNER. FOUND FOOTINGS REPLACED TO MATCH THE EXISTING, AND POST BASE AND POLE REPLACED WILL ALL CONNECTING PIECES COMPLETED. COMPLIANCE / CLOSE CASE. |