Case: T18DV05917
Case Details
Entered Date:
09/19/2018
Applicant:
PAPO CONSTRUCTION LLC
Description:
WORK COMPLETED EXCEEDS RECONNECT PERMIT.
Outstanding Inspections
Case Number: T18DV05917
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-COMMERCL
Total Outstanding Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| INSP - FOLLOW UP CODE ENFORCE | None | Not Inspected |
Completed Inspections
Case Status: COMPLIAN
Case Number: T18DV05917
Case Description: WORK WITHOUT PERMITS-COMMERCL
Total Completed Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2018 | INSP - INITIAL CODE ENFORCMENT | GOODMAN | Approved | VISITED SITE, FOUND WORK COMPLETED BEYOND THE SCOPE OF A ELECTRICAL RECONNECT PERMIT. MY FINDINGS ARE AS FOLLOWS: >ADDED ROOF TOP A/C UNIT, ADDED PLUMBING AND ELECTRICAL. >ADDED HOTWATER HEATER AND PLUMBING. ADDTIONAL INTERIOR PLUMBING. >ADDED INTERIOR ELECTRICAL, POSSIBLE NEW CIRCUITS. >ADDED DRYWALL. |