Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T18DV05826
Case Details
Entered Date:
09/17/2018
Applicant:
SANTA CRUZ ENTERPRISES LLC
Description:
APT 308 W/OUT A/C FOR A WEEK
Case Violations
Case Number: T18DV05826
Case Status: COMPLIAN
Case Description: EMERGENCY
Total Violations: 1
Violation Date | Code Statue |
---|---|
09/18/2018 | T.C. Ch. 16, Sec. 16-11(b) (2) COOLING. Every dwelling unit, guest room, and congregate residence shall be provided, in at least one habitable room, with either mechanical cooling or an alternate cooling method. Cooling facilities shall be installed and maintained in a safe condition and in accordance with the manufacturer's recommendations, and shall be capable of providing adequate cooling, appropriate for the climate, to assure a safe living environment. Evaporative cooling shall be maintained to be free of excessive rust, corrosion or mineral deposits that limit proper operation. Any mounting apparatus for a cooling facility must be structurally sound. Mechanical fans or portable evaporative cooling devices may only be used on a temporary basis as the sole source of cooling when the permanent cooling system is being repaired or replaced. |
Completed Inspections
Case Status: COMPLIAN
Case Number: T18DV05826
Case Description: EMERGENCY
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/18/2018 | INSP - INITIAL CODE ENFORCMENT | GONZALEZ | Approved | UPON INSPECTION NO TEMPORARY AC UNIT HAS BEEN GIVEN, APT TEMP DISPLAYED 91 DEGREES INSIDE, AC UNIT WAS BLOWING HOT AIR, APARTMENT MANAGER STATED THE RECEIVED THE FREON ON 9/17/2018 AND WILL BE CHARGED BY 3:30 OF 9/18/2018 |
10/03/2018 | INSP - FOLLOW UP CODE ENFORCE | GONZALEZ | Approved | AC UNIT REPAIRED CLOSING CASE |
Completed Activity Special Conditions
Case Description - EMERGENCY
Case Number - T18DV05826
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 3
Date | Name |
09/18/2018 | CONTACTED BY PHONE |
09/18/2018 | NOTICE OF VIOLATION ISSUED |
10/03/2018 | VIOLATION CLOSED |