Case Details

Status:

COMPLIAN

Type:

COMMERCIAL ZONING

Entered Date:

08/03/2018

Applicant:

RIALTO THEATRE FOUNDATION

Description:

EXITS NOT CLEARLY MARKED. BUILDING TOO HOT FOR CONCERT VENUE, PEOPLE WERE PASSING OUT AT A CONCERT 8/2/18

Completed Inspections

Case Status: COMPLIAN
Case Number: T18DV04566
Case Description: COMMERCIAL ZONING
Total Completed Inspections - 2
End Date Description Inspector Results Comments
08/09/2018 INSP - INITIAL CODE ENFORCMENT GOODMAN Approved VISITED SITE, MET WITH MANAGER MARK MARTINEZ WHO STATED THAT ON 8/02 FOR THE EVENT THAT EVENING THE AIR CONDITIONING WAS WORKING JUST FINE. MARK STATED THER IS WORK BEING CONDUCTED ON THE BATHROOMS, UNDER PERMIT T18CM05520. FOR THE MECHANICAL INSPECTON, A AIR BALANCE REPORT IS BEING REQUIRED, IT IS ON THE INSPECTION CARD. ADVANTAGE AIR HAS BEEN CONTACTED BY THE CONTRACTOR TO COMPLETE THE REPORT. MY PREVIOUS INSPECTION OF tHE PROPERTY WAS WHEN THE NEW UNITS AND DUCT WORK WAS INSTALLED IN 2006-2008. TODAYS INSPECTION FOUND THE FRONT RECEPTION AREA TO BE COMFORTABLE WITH THE FRONT DOORS OPEN, AND AIR MOVING FROM THE A/C SYSTEM. MANAGER STATED IT WOULD BE DIFFERENT WITH 1100 PEOPLE AT THE VENUE. THREE INSPECTIONS HAVE BEEN FINALED FROM TFD MEANING THEY HAVE BEEN TO THE STRUCTURE AND HAVE NOT FOUND ANY IMMENENT HAZARDS THOSE DAYS OF INSPECTION. NO VIOLATIONS. COMPLIANCE / CLOSE CASE.
10/01/2018 INSP - FOLLOW UP CODE ENFORCE GOODMAN Approved RECEIVED A EMAIL FROM CLAYTON TREVILLYAN THAT THE C/E CASE COULD BE CLOSED AS THE ISSUE WAS COVERED UNDER THE MECHANICAL PORTION WAS COVERED UNDER PERMIT FROM DSD. COMPLIANCE / CLOSE CASE.