Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T18DV04517
Case Details
Entered Date:
08/02/2018
Applicant:
19TUC JAK PROPERTIES LP
Description:
UNIT 126 - BATHROOM SHOWER LEAKING, CEILING LEAKING (TOILET FROM ABOVE UNIT LEAKING ON HER CEILING) A/C LEAKING NO HOT WATER, ROACH INFESTATION
Completed Inspections
Case Status: COMPLIAN
Case Number: T18DV04517
Case Description: MULTIPLE TYPES
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/03/2018 | INSP - INITIAL CODE ENFORCMENT | GOODMAN | Approved | VISITED SITE, KNOCKED ON DOOR, MET WITH OCCUPANT VANNESSA WHO STATED WORKERS HAVE OPENED UP THE CEILING IN BOTH THE HALL AND BATROOM, TO FIX A LEAK, DETERMINE WHY HOTWATER IS NOT GETTING TO THE TUB/SHOWER CEILING PATCHES HAVE NOT YET BEEN COMPLETED. SPOKE WITH THE MANAGER WHO STATED ENTERING THE UNIT HAS BEEN DIFICULT BECAUSE OCCUPANT GOES TO SCHOOL AND WHEN SHE IS HOME DOES NOT ALLOW ENTRY. SPOKE TO MAINTANENCT AND OCCUPANT TO SET UP A TIME TO REENTER THE UNIT. BLEACH WAS SPRAYED ABOVE THE HALL AREA AND MAINTANENCE WAITING FOR THE AREA TO DRY. WILL COMPLETE THE PATCH AND TEXTURE BY THE WEEKEND. |
08/07/2018 | INSP - FOLLOW UP CODE ENFORCE | GOODMAN | Approved | REVISITED SITE, DID FIND WORK COMPLETED ONLY THE PATCH NEEDED TO BE PAINTED. WORK WAS IN PROGRESS AND NOW NEAR COMPLETION. NOV WAS NOT REQUIRED. COMPLIANCE / CLOSE CASE. |