Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T18DV04080
Case Details
Entered Date:
07/15/2018
Applicant:
MANUEL & CYNTHIA CALVILLO III
Description:
CAR INTO BUILDING
Outstanding Inspections
Case Number: T18DV04080
Case Status: COMPLIAN
Case Description: CAR THROUGH RESIDENTIAL BUILDI
Total Outstanding Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| EMERGENCY CALL OUT | None | Not Inspected |
Completed Inspections
Case Status: COMPLIAN
Case Number: T18DV04080
Case Description: CAR THROUGH RESIDENTIAL BUILDI
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2018 | INSP - INITIAL CODE ENFORCMENT | VALDEZ | Approved | EMERGENCY CALL OUT BY TPD: CAR INTO BUILDING,, THIS BUILDING IS A 2 STORY 2 X 6 WOOD FRAMED WITH EXTERIOR STUCCO FINISH. THE VEHICLE FLEW AND HIT THE BUILDING THERE IS DAMAGE TO THE 2ND STORY WALL AN AREA OF 8 X 8 WAS PUSHED IN ABOUT 2 FEET. THERE IS DRYWALL DAMAGE AND PUNCTURES HOLE IN THE HALLWAY. THERE IS EXPOSED ROMEX IN ONE OF THE PUNCTURE HOLES BUT N ROMEX VISIBLE IN THE DAMAMED WALL. THERE IS CEILLING LIGHTS OVER THE DAMAGED WALL. THE 1ST FLOOR HAS DAMAGE TO THE FRONT MAIN ENTRANCE THE EXTERIOR WALL IN THE OPEN PATIO AREA IS CRUSHED IN. THE DOOR / GLASS WINDOW WAS KNOCKED OFF THE WALL FRAME. THE EXTERIOR OF THE BUILDING HAS DAMAGE AND MULTIPLE PUNCTURE HOLES IN THEWALL THE 1ST FLOOR HAS A BEAM OVER THE OPEN PATIO AREA WITH DAMAGE IT HAS SPLIT. THE 2ND STORY EXT WALL 6 X 8 AREA WAS CRUSHED IN. MULTIPLE CRACKS IN THE STUCCO IN THE IMPACT AREA. POWER WAS DISCONNECT AT THE MAIN DISCONNECT BY TEP. UNIT WAS CONDEMNED .. PERMITS REQUIRED FOR REPAIRS |
| 07/17/2018 | INSP - FOLLOW UP CODE ENFORCE | VALDEZ | Approved | ALL DOCUMENTS AND PHOTOS IN SIRE.. CLOSE CASE |
Completed Activity Special Conditions
Case Description - CAR THROUGH RESIDENTIAL BUILDI
Case Number - T18DV04080
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 7
| Date | Name |
| 07/15/2018 | CONTACTED BY PHONE |
| 07/15/2018 | CONTACTED IN PERSON |
| 07/15/2018 | NOTICE AND ORDER ISSUED |
| 03/17/2022 | SEC LEIN PLACED ON PROPERTY IN THE AMOUNT OF ??? |
| 07/31/2018 | SEC LETTER OF BILLING FOR $??? SENT TO OWNERS |
| 07/15/2018 | STRUCTURE SECURED BY ??? |
| 07/15/2018 | CALLBACK |