Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case Details

Status:

COMPLIAN

Type:

WORK WITHOUT PERMITS-RESIDENTL
Address:

Entered Date:

05/15/2018

Applicant:

LEOPOLDO R & ANITA B VIDAL JT/RS

Description:

: Constructing new masonry wall without site plan or zoning review. This wall appears to be encroaching on a public area which is not owned by the property owner.

Case Violations

Case Number: T18DV02779
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Violations: 2
Violation Date Code Statue
05/30/2018 UDC Sec. 10.2.1. COMPLIANCE REVIEW, PROPOSED DEVELOPMENT No land may be used or occupied; no site improvement, modification, or construction started; no existing use or structure expanded, reconstructed, changed, or otherwise altered; and no land may be divided into multiple parcels until compliance with the provisions of the UDC has been certified through a zoning review process by PDSD. No City agency may issue a permit for excavation, grubbing, grading, paving, demolition, or construction of any sort before certification of compliance with provisions of the UDC has been determined by PDSD. In the event a zoning regulation requires interpretation, such interpretation shall be issued by the Zoning Administrator in accordance with Sections 1.5, Interpretations of the Unified Development Code.
05/30/2018 T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe.

Completed Inspections

Case Status: COMPLIAN
Case Number: T18DV02779
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Completed Inspections - 2
End Date Description Inspector Results Comments
05/30/2018 INSP - INITIAL CODE ENFORCMENT LOPEZ Approved WILL BE ISSUEING NOTICE FOR WALL THAT WAS BUILT WITH THE PROPER PAPERWORK, LOOKS LIKE WALL IN THE RIGHT AWAY, 30 DAYS TO COMPLY
07/17/2018 INSP - FOLLOW UP CODE ENFORCE LOPEZ Approved WENT BY PROPERT TO TALK TO OWNER, OWNER HAD SEVIA DONE ON PROPERTY AND WILL RESUBMIT PLANS FOR PERMIT, WILL FOLLOW UP IN 30 DAYS

Completed Activity Special Conditions

Case Description - WORK WITHOUT PERMITS-RESIDENTL
Case Number - T18DV02779
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 3
Date Name
07/02/2018 CONTACTED BY PHONE
06/13/2018 CONTACTED IN PERSON
05/30/2018 NOTICE OF VIOLATION ISSUED