Case: T18DV02008
Case Details
Entered Date:
04/11/2018
Applicant:
SJH HOLDINGS LLC STEVEN HOLLANDER
Description:
BUILDING FIRE
Outstanding Inspections
Case Number: T18DV02008
Case Status: COMPLIAN
Case Description: FIRE AT COMMERCIAL BUILDING
Total Outstanding Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| EMERGENCY CALL OUT | None | Not Inspected |
Completed Inspections
Case Status: COMPLIAN
Case Number: T18DV02008
Case Description: FIRE AT COMMERCIAL BUILDING
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/11/2018 | INSP - INITIAL CODE ENFORCMENT | VALDEZ | Approved | EMERGENCY CALL OUT BY TFD: COMMERCIAL BUILDING, THERE WAS A FIRE IN THE SHOP AREA OF THE MOTORCYCLE BUSINESS. (3) 2X8 RAFTERS WERE DAMAGE BY FIRE AND THE CUT OUT TO ROOF.. THE ROOF DECKING WAS CUT OUT AREA ESTIMATE OF 6' X 10' THE EAVE AREA OF DAMAGE IS 2' X 6' AREA, TOTAL ROOF DAMAGED AREA IS 8' X 10'. THE INSULATION IS WET THE CEILING COVERNIG IS A PLASTIC SHEATHING. THERE IS HEAT DAMAGE TO A 3/4 EMT CONDUIT AREA OF 3 FEET AND A 1/2 EMT CONDUIT AREA OF 3 FEET. THE MAIN SWITCH GEAR 3 MAIN BREAKERS ARE OFF AND LOCKED BY TEP. INTERIOR PANEL A CIRCUIT BREAKERS 11/15, 19/21, 35/39 TRIPPED. PANEL B CIRCUIT BREAKERS 2,6,8 TRIPPED. PANEL C CIRCUIT BREAKER 6 TRIPPED. THE BUILDING WAS CONDEMNED. PERMITS REQUIRED FOR ALL REPAIRS. |
| 04/13/2018 | INSP - FOLLOW UP CODE ENFORCE | VALDEZ | Approved | CLOSE CASE |
Completed Activity Special Conditions
Case Description - FIRE AT COMMERCIAL BUILDING
Case Number - T18DV02008
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 3
| Date | Name |
| 04/11/2018 | CONTACTED IN PERSON |
| 04/11/2018 | NOTICE AND ORDER ISSUED |
| 04/11/2018 | CALLBACK |