Case: T18DV00373
Case Details
Entered Date:
01/19/2018
Applicant:
PURPLE SAGE REALTY ATTN: MARY LOU LOPEZ
Description:
CAR INTO BUILDING
Outstanding Inspections
Case Number: T18DV00373
Case Status: COMPLIAN
Case Description: EMERGENCY
Total Outstanding Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| EMERGENCY CALL OUT | None | Not Inspected |
Completed Inspections
Case Status: COMPLIAN
Case Number: T18DV00373
Case Description: EMERGENCY
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/19/2018 | INSP - INITIAL CODE ENFORCMENT | VALDEZ | Approved | VEHICLE HIT AND CAUSE DAMAGE TO A BEARING WALL, FRONT EXTERIOR WALL TO DWELLING AREA OF DAMAGE IS 8 X 16 THERE A WALL SWITCH AND RECEPTACLE IN THE DAMAGED WALL. THE POWER WAS OFF BY COT, TEP DID BOOT THE METER OFF. HAD COT CONTRACTOR SECURE THE DAMAGED OPENING. THE HOME WAS CONDEMNED, NOTICE AND ORDER ALNG WITH PLACARD WAS POSTED ON THE DWELLING |
| 01/23/2018 | INSP - FOLLOW UP CODE ENFORCE | VALDEZ | Approved | ALL DOCUMENTS AND PHOTS IN SIRE.. CLOSE CASE |
Completed Activity Special Conditions
Case Description - EMERGENCY
Case Number - T18DV00373
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 5
| Date | Name |
| 01/19/2018 | CONTACTED BY PHONE |
| 01/19/2018 | CONTACTED IN PERSON |
| 01/19/2018 | NOTICE AND ORDER ISSUED |
| 01/19/2018 | STRUCTURE SECURED BY ??? |
| 01/19/2018 | CALLBACK |