Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case Details

Status:

COMPLIAN

Type:

RESIDENTIAL ZONING

Entered Date:

04/25/2017

Applicant:

EDWARD M II & CAROLINE LOZA JT/RS

Description:

added two rows of bricks to existing wall without review

Case Violations

Case Number: T17DV01713
Case Status: COMPLIAN
Case Description: RESIDENTIAL ZONING
Total Violations: 2
Violation Date Code Statue
05/25/2017 T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe.
05/25/2017 UDC Sec. 10.2.1. COMPLIANCE REVIEW, PROPOSED DEVELOPMENT No land may be used or occupied; no site improvement, modification, or construction started; no existing use or structure expanded, reconstructed, changed, or otherwise altered; and no land may be divided into multiple parcels until compliance with the provisions of the UDC has been certified through a zoning review process by PDSD. No City agency may issue a permit for excavation, grubbing, grading, paving, demolition, or construction of any sort before certification of compliance with provisions of the UDC has been determined by PDSD. In the event a zoning regulation requires interpretation, such interpretation shall be issued by the Zoning Administrator in accordance with Sections 1.5, Interpretations of the Unified Development Code.

Outstanding Inspections

Case Number: T17DV01713
Case Status: COMPLIAN
Case Description: RESIDENTIAL ZONING
Total Outstanding Inspections - 1
End Date Description Inspector Results Comments
06/12/2017 NPO - WORK WITHOUT PERMIT MMENDOZA Item closed

Completed Inspections

Case Status: COMPLIAN
Case Number: T17DV01713
Case Description: RESIDENTIAL ZONING
Total Completed Inspections - 4
End Date Description Inspector Results Comments
05/23/2017 INSP - INITIAL CODE ENFORCMENT MMENDOZA Approved
05/23/2017 INSP - INITIAL CODE ENFORCMENT MMENDOZA Approved
05/23/2017 INSP - INITIAL CODE ENFORCMENT MMENDOZA Approved ON SITE INSPECTION FOUND OWNER ADDED 2 COURSES TO EXISTING BLOCK PATIO WALL WITH OUT PERMITS OR SITE PLAN REVEIW.
06/08/2017 INSP - FOLLOW UP CODE ENFORCE MMENDOZA Approved ON SITE INSPECTION WITH OWNER PRESENT, OWNER OBTAINED PERMIT # T17CM04468, VIOLATION ABATED-CLOSE CASE

Completed Activity Special Conditions

Case Description - RESIDENTIAL ZONING
Case Number - T17DV01713
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 1
Date Name
05/25/2017 CONTACTED BY MAILING