Case: T17DV00291
Case Details
Entered Date:
01/22/2017
Applicant:
CHRISTOPHER CENTUORI - HOA PROPERTY MANAGER
Description:
COMMUNICATION CALLED THAT T.F.D. ON SITE WITH A CARPORT FIRE THAT COLLAPSED, F170220044
Outstanding Inspections
Case Number: T17DV00291
Case Status: COMPLIAN
Case Description: FIRE AT COMMERCIAL BUILDING
Total Outstanding Inspections - 6
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/21/2017 | EMERGENCY CALL OUT | VIDAL | Item closed | |
| 03/21/2017 | NPO(EL)-MAIN/PANEL/SUB/DISCONT | VIDAL | Item closed | |
| 03/21/2017 | NPO(EL)-WIRING/SWITCH/OUTLT/FX | VIDAL | Item closed | |
| 03/21/2017 | NPO - REFUSE/TRASH/DEBRIS | VIDAL | Item closed | |
| 03/21/2017 | NPO - EXT. BUILDING MAINTENANC | VIDAL | Item closed | |
| 03/21/2017 | NPO - WORK WITHOUT PERMIT | VIDAL | Item closed |
Completed Inspections
Case Status: COMPLIAN
Case Number: T17DV00291
Case Description: FIRE AT COMMERCIAL BUILDING
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2017 | INSP - INITIAL CODE ENFORCMENT | VIDAL | Approved | Received call from communication that T.F.D. on site with a carport fire with vehicles. Arrived and the fire happened at 5:30 AM and was still being investigated at 2:00 PM. The fire was a 10 car carport and vehicles were inside the carport at the time of the fire. The structure is a total lost and all the trusses have been burned and what is left is on the ground. The wood beams in front are burned and on steel post. The rear beams are leaning towards the north and those are being supported with wood wall frame panel. The norh side of the property has a masonry wall that protects from the residential area north of the property. Did call the property manager Christopher Centuori and was given permission to have the the property secured once the investigation was completed. Did call Biff Baker Fence to have the property secured with fence panels with gates on each end of the drive portion of the parking lot. The wiring for the lighting on the ceiling were all damaged and the wiring from the juction box was pulled from the east side box. Did talk to Chris about supporting the beam supports on the north side and that can be done tomorrow due to in the fenced area. Did the posting of Do Not Enter on the beam support in the middle on the north side. Biff Baker Fence used 13-panels, 5-Tee posts, 7-round post with free stands. This address was used due to across from the carports that burned. The structure at this address has no damage from the fire due to detached and across the parking lot. Will check in 30 days. RV. |
| 03/21/2017 | INSP - FOLLOW UP CODE ENFORCE | VIDAL | Approved | The property has been cleaned and the temporary fencing has been removed from the property. At this time the H.O.A. is not sure when they are going to re-build the carport that was burned in the fire. At this time the case will be closed and the H.O.A. has been advised that a permit is required to have the carport re-built and they understood. Violation Abated, Close Case. RV. |
Completed Activity Special Conditions
Case Description - FIRE AT COMMERCIAL BUILDING
Case Number - T17DV00291
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 6
| Date | Name |
| 01/22/2017 | CONTACTED BY PHONE |
| 01/22/2017 | NOTICE OF VIOLATION ISSUED |
| 03/21/2017 | VIOLATION CLOSED |
| 01/13/2021 | SEC LEIN PLACED ON PROPERTY IN THE AMOUNT OF ??? |
| 01/22/2017 | STRUCTURE SECURED BY ??? |
| 03/21/2017 | CONTRACTOR ABATEMENT |