Case: T16DV04127
Case Details
Entered Date:
07/07/2016
Applicant:
BURNS AMY
Description:
WORK WITHOUT PERMITS. REPLACING WALL IN ADOBE HOMES
Outstanding Inspections
Case Number: T16DV04127
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Outstanding Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| INSP - FOLLOW UP CODE ENFORCE | None | Not Inspected | ||
| 07/15/2016 | NPO - WORK WITHOUT PERMIT | GOODMAN | Item closed |
Completed Inspections
Case Status: COMPLIAN
Case Number: T16DV04127
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Completed Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2016 | INSP - INITIAL CODE ENFORCMENT | GOODMAN | Approved | VISITED SITE, MET WITH OCCUPANTS WHO ALLOWED ENTRY. HOUSE IS FAIRLY OLD, WITH ADOBE INTERIOR AND EXTERIOR WALLS. A ROOF LEAK CAUSED DAMAGE TO ONE OF THE INTERIOR WALLS. AT THE TIME OF MY INSPECTION, THE ROOF HAD BEEN PATCHED BUT NOW NEEDS TO BE COATED AND THE INTERIOR ADOBE WALL HAS HAD THE PATCH STARTED BUT NOT COMPLETED. THE OCCUPANTS ARE NOT ALLOWING ENTRY TO COMPLETE THE PATCH. OCCUPANTS ARE USING THIS AS A TOOL TO BREAK LEASE, BUT IS SOUNDS LIKE OWNER IS ALLOWING THEM OUT OF THE LEASE, MANAGER DANNY CONFIRMED THIS, TENNANTS ACTIVELY LOOKING FOR NEW PLACE AND ARE PAYED UP TILL THE END OF THE MONTH. PERMITS NOT REQUIRED FOR THE COMPLETED ROOF PATCH OR TO PATCH THE WALL WHICH HAS BEEN STARTED BUT NOT COMPLETED DUE TO TENANTS NOT ALLOWING ENTRY. DID LSK MANAGER TO MAKE ARRANGEMENTS WITH THE TENNANTS TO COMPLETE THE PATCH. MANGER THINKS THEY MAY WAIT UNTIL TENNANTS ARE OUT THEN COMPLETE THE WALL PATCH. NO VIOLATION / CLOSE CASE. |
Completed Activity Special Conditions
Case Description - WORK WITHOUT PERMITS-RESIDENTL
Case Number - T16DV04127
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 1
| Date | Name |
| 10/12/2016 | VIOLATION CLOSED |