Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case Details

Status:

REFERRED

Type:

WORK WITHOUT PERMITS-RESIDENTL
Address:

Entered Date:

04/21/2016

Applicant:

317 S WARREN LLC ATTN: DAMIAN FIORILLO

Description:

REMODEL INTERIOR WITHOUT PERMIT. POSSIBLE CONVERSION TO DUPLEX.

Outstanding Inspections

Case Number: T16DV02523
Case Status: REFERRED
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Outstanding Inspections - 6
End Date Description Inspector Results Comments
04/25/2016 NPO(EL)-WIRING/SWITCH/OUTLT/FX NAVARRO Follow-up inspection
04/25/2016 NPO(PL)-PLUMBING SYSTEM & FX NAVARRO Follow-up inspection
04/25/2016 NPO(PL)-GAS SUPPLY/CONNECT NAVARRO Follow-up inspection
04/25/2016 NPO(HC)-COOLING NAVARRO Follow-up inspection
04/25/2016 NPO(HC)-HEATING & VENTILATION NAVARRO Follow-up inspection
04/25/2016 NPO - WORK WITHOUT PERMIT NAVARRO Follow-up inspection

Completed Inspections

Case Status: REFERRED
Case Number: T16DV02523
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Completed Inspections - 2
End Date Description Inspector Results Comments
04/21/2016 INSP - INITIAL CODE ENFORCMENT NAVARRO Approved Visited site, inspected, found as follows: 1) unit was vacant 2) there is stucco placed on exterior 3) all windows have been upgraded 4) old service entrance(60 amp) was removed 5) two wire system and has three prong outlets inside unit 6) wrote notice of violation 7) placed a stop work order on window with the notice of violation 8) will contact owner
04/27/2016 INSP - FOLLOW UP CODE ENFORCE NAVARRO Approved this case will be rerferenced to the city ot tucson building official

Completed Activity Special Conditions

Case Description - WORK WITHOUT PERMITS-RESIDENTL
Case Number - T16DV02523
Case Status: REFERRED
Total Completed Case Activity Conditions: 6
Date Name
04/21/2016 CONTACTED BY PHONE
05/11/2016 RETURNED MAIL
04/25/2016 CONTACTED BY MAILING
04/21/2016 STOP WORK ORDER ISSUED
04/21/2016 NOTICE OF VIOLATION ISSUED
04/27/2016 REFERENCE

Documents

File Name Document Type  
NOV T16DV02523 04-25-16.PDF DOCUMENTS VIEW