Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T16DV02080
Case Details
Entered Date:
04/05/2016
Applicant:
GARCIA JOSE R & MARTHA J CP/RS
Description:
Fire
Case Violations
Case Number: T16DV02080
Case Status: COMPLIAN
Case Description: EMERGENCY
Total Violations: 2
Violation Date | Code Statue |
---|---|
04/05/2016 | T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe. |
04/05/2016 | T.C. Ch. 16, Sec. 16-13(b) ACCUMULATION OF REFUSE PROHIBITED. Each owner, lessee, tenant, resident or occupant shall maintain a property so it is free of accumulated refuse and debris. Accumulated refuse and debris means contained or uncontained refuse and debris that is present on the property in a manner not authorized by the Tucson Code. Material recycling facilities meeting the requirements of section 15-24.7 are exempt from this prohibition. |
Completed Inspections
Case Status: COMPLIAN
Case Number: T16DV02080
Case Description: EMERGENCY
Total Completed Inspections - 4
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/05/2016 | INSP - INITIAL CODE ENFORCMENT | LOPEZ | Approved | Damages were to the water heater, electric line going into the addition from the exterior into the interior, gas was pinned and elecrical meter was also tagged, until all electrical is checked by licensed electrician. outside exterior rafter was damaged at the East End of home, also 20 foot section overhang was also damaged, with roof, damage to the exterior wood sidding, also has an exterior electrical plug out of code, will be shutting down Home and will post Due to unknown electrical damage. Pitures and paperwork will be in sire. |
08/10/2016 | NPO - REFUSE/TRASH/DEBRIS | LOPEZ | Approved | |
08/10/2016 | NPO - WORK WITHOUT PERMIT | LOPEZ | Approved | |
08/10/2016 | INSP - FOLLOW UP CODE ENFORCE | MMENDOZA | Approved | PERMIT #T16CM02532 IN ISSUED STATUS- VIOLATIONS ABATED-CLOSE CASE |
Completed Activity Special Conditions
Case Description - EMERGENCY
Case Number - T16DV02080
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 5
Date | Name |
04/05/2016 | CONTACTED IN PERSON |
04/08/2016 | CONTACTED BY MAILING |
04/08/2016 | NOTICE OF VIOLATION ISSUED |
11/14/2016 | VIOLATION CLOSED |
04/05/2016 | REFERENCE |