Case: T15DV07724
Case Details
Entered Date:
10/09/2015
Applicant:
KMS ENTERPRISES LLC
Description:
House is vacant and there appears to be a major remodel going on. We saw today that there is new A/C duct being run on the roof and probably going to install a new A/C unit. We want to ensure that permits are being obtained so it is properly and safely installed
Case Violations
Case Number: T15DV07724
Case Status: COMPLIAN
Case Description: MULTIPLE TYPES
Total Violations: 1
| Violation Date | Code Statue |
|---|---|
| 10/26/2015 | T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe. |
Outstanding Inspections
Case Number: T15DV07724
Case Status: COMPLIAN
Case Description: MULTIPLE TYPES
Total Outstanding Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2015 | NPO - WORK WITHOUT PERMIT | GOODMAN | Item closed | |
| 10/28/2015 | NPO - UNSECURED BUILD OR STRUC | GOODMAN | Item closed |
Completed Inspections
Case Status: COMPLIAN
Case Number: T15DV07724
Case Description: MULTIPLE TYPES
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2015 | INSP - INITIAL CODE ENFORCMENT | GOODMAN | Approved | VISITED SITE, PRIOR TO ARRIVAL I DID CHECK AERIAL VIEWS AND FOUND NO CHANGE IN THE ROOF AERIAL VIEWS FROM 1998 TO 2014. UPON ARRIVAL AND INSPECTION OF THE BUILDING I DID FIND NEW DOORS FRONT AND REAR, SOME INTERIOR DOORS. FOUND NEW TILE, NEW PAINT, CABINETS AND PLUMBING AND ELECTRICAL FIXTURES. I FOUND THE INTERIOR RETEXTURED, DID NOT FIND DRYWALL IN THE 40 YARD DUMPSTER, WHY I FEEL IT WAS JUST RETEXTURED. I DID HOWEVER FIND THE NEW DUCTWORK AND NEW HEAT PUMP ON THE ROOF. NOV TO BE ISSUED FOR THE MECHANICAL ADDITION. KMS WAS CONTACTED ABOUT THE NOV. |
| 11/30/2015 | INSP - FOLLOW UP CODE ENFORCE | GOODMAN | Approved | FOLLOW UP INSPECTION FOUND WORK COMPLETED UNDER PERMIT T15CMO8062. COMPLIANCE / CLOSE CASE. |
Completed Activity Special Conditions
Case Description - MULTIPLE TYPES
Case Number - T15DV07724
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 3
| Date | Name |
| 10/28/2015 | CONTACTED BY MAILING |
| 10/26/2015 | NOTICE OF VIOLATION ISSUED |
| 10/06/2016 | VIOLATION CLOSED |