Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case Details

Status:

COMPLIAN

Type:

WORK WITHOUT PERMITS-RESIDENTL

Entered Date:

04/16/2015

Applicant:

AFK REAL ESTATE INVESTMENTS LLC

Description:

MOBILE HOMES- NO SET UP PERMITS

Case Violations

Case Number: T15DV02978
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Violations: 1
Violation Date Code Statue
04/23/2015 T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe.

Outstanding Inspections

Case Number: T15DV02978
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Outstanding Inspections - 1
End Date Description Inspector Results Comments
11/29/2016 NPO - WORK WITHOUT PERMIT GOODMAN Item closed

Completed Inspections

Case Status: COMPLIAN
Case Number: T15DV02978
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Completed Inspections - 2
End Date Description Inspector Results Comments
04/22/2015 INSP - INITIAL CODE ENFORCMENT GOODMAN Approved VISITED SITE #66 FOUND A TRAILER PARTIALLY SET UP, WATER, GAS, AND SEWER HOOKED UP. THE AWNING WERE STILL ON THE GROUND, NOT COMPLETED. OWNER STATED HE PAYED PARK MANAGERS FOR MONTHLY LOT FEE AND SET UP, BUT THAT SET UP WAS NEVER COMPLETED. MET WITH MANAGER WHO STATED SHE IS HAVING TROUBLE WITH THE SET UP PERSON WHO WAS RESPONSIBLE FOR THE PERMIT. ASKED MANAGER WHERE #245 SHE SAID THERE WAS NO SUCH NUMBER, CALLED THE STATE SPOKE WITH RON WHO INFORMED ME THAT LOT 25 WAS THE SECOND LOT. SPOKE TO MARTIN ROMERO WHO STATED NOV COULD BE ISSUED FOR 30 DAY FOLLOW UP.
07/31/2015 INSP - FOLLOW UP CODE ENFORCE GOODMAN Approved ADDITIONAL TIME EXTENDED TO THE MOBILE HOME PARK DUE TO DISAGREEMENT WITH PERSON MOVING THE TRAILER AND HOME SET UP NOT COMPLETED. MANAGER STATED SET UP FOR 25 WAS JUST COMPLETED AND INSPECTION PENDING AND HAVE STARTED PROCESS FOR SPACE #66, HAVE RUN INTO PROBLEMS BUT HOPE TO BE COMPLETED BY 8/07/2015. EXTENSION GRANTED.

Completed Activity Special Conditions

Case Description - WORK WITHOUT PERMITS-RESIDENTL
Case Number - T15DV02978
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 3
Date Name
04/29/2015 CONTACTED IN PERSON
04/23/2015 NOTICE OF VIOLATION ISSUED
11/29/2016 VIOLATION CLOSED