Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case Details

Status:

COMPLIAN

Type:

COMMERCIAL ZONING

Entered Date:

03/19/2015

Applicant:

WILCOX CENTER II LLC

Description:

EGRESS ISSUE

Case Violations

Case Number: T15DV02102
Case Status: COMPLIAN
Case Description: COMMERCIAL ZONING
Total Violations: 2
Violation Date Code Statue
03/27/2015 T.C. Ch. 16, Sec. 16-11(e) PLUMBING SYSTEMS. (1) Dwelling units shall be provided with one or more bathrooms equipped with a water closet, lavatory, and either a bathtub or shower. The number of water closets and lavatories for commercial buildings shall be determined by the International Building Code based on the use of the building. Each sink, bathtub and shower shall have hot and cold running water as necessary for its normal operation and use.
03/27/2015 UDC, Sec. 10.2.3. COMPLIANCE REVIEW, EXISTING DEVELOPMENT Any land used or occupied; any site improvement, modification, or construction started; any existing use or structure expanded, reconstructed, changed, or otherwise altered; and any land divided into multiple parcels without certification of compliance with the provisions of the UDC through a zoning review process is considered a violation of the UDC. Enforcement of violations shall be in accordance with Section 10.4, Penalties and Remedies.

Outstanding Inspections

Case Number: T15DV02102
Case Status: COMPLIAN
Case Description: COMMERCIAL ZONING
Total Outstanding Inspections - 1
End Date Description Inspector Results Comments
08/14/2015 NPO - EGRESS STEVENS Item closed

Completed Inspections

Case Status: COMPLIAN
Case Number: T15DV02102
Case Description: COMMERCIAL ZONING
Total Completed Inspections - 2
End Date Description Inspector Results Comments
03/19/2015 INSP - INITIAL CODE ENFORCMENT STEVENS Approved At site, I inspected the front and rear doors of each unit. Some of the doors had panic hardware and other had a single sided dead bolt with a thumbturn. I will research the plans for each unit according to the C of O.
03/31/2015 INSP - FOLLOW UP CODE ENFORCE STEVENS Approved I was at 2700 W. Broadway Blvd, main office. I spoke to Miguel and Nydia about the issues outlined on the NOV. I followed up with Chris K. to inform him that the NOV was hand delivered. F/U 5 days.

Outstanding Case Activity Conditions

Date Name Approved
03/27/2015 T.C. Ch. 16, Sec. 16-14(c) BUILDINGS AND STRUCTURES CONSTITUTING A NUISANCE. All buildings and structures are to be maintained so as not to pose a threat to the health and safety of any person or persons. The condition of a building or structure that meets any or all of the following is a public nuisance, is a violation of this chapter, and subjects the building or structure to abatement as provided in Article VI of this chapter, including demolition as provided in section 16-65: (1) The building or structure lacks safe and adequate means of exit in case of fire or panic. Not Approved

Completed Activity Special Conditions

Case Description - COMMERCIAL ZONING
Case Number - T15DV02102
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 2
Date Name
08/14/2015 VIOLATION CLOSED
03/19/2015 RESEARCH

Documents

File Name Document Type  
T15DV02102.PDF DOCUMENTS VIEW