Case: T13DV06565
Case Details
Entered Date:
09/05/2013
Applicant:
ROATH PROPERTIES LLC ATTN: JANE GEE
Description:
Roof leaking.
Case Violations
Case Number: T13DV06565
Case Status: COMPLIAN
Case Description: MULTIPLE TYPES
Total Violations: 3
| Violation Date | Code Statue |
|---|---|
| 09/12/2013 | T.C. Ch. 16, Sec. 16-11(f)(5) All interior coverings, finishes, surfaces including walls, ceilings and floors shall be maintained in a good, clean and sanitary condition. Peeling, chipping, flaking or abraded paint shall be repaired, removed or covered. All walls, ceilings or floors shall be free from holes, breaks and loose or rotting materials. Cracked or loose plaster, wallboard, decayed wood or other defective surface conditions shall be corrected. |
| 09/12/2013 | T.C. Ch. 16, Sec. 16-12(b)(3) ROOFS. The roof of every building or structure shall be maintained in a safe condition and shall provide weather protection for that building or structure. Roof coverings shall not be rotted, broken, split, buckled or otherwise deteriorated. T.C. Ch. 16, Sec. 16-12(b) FOUNDATIONS, WALLS, ROOFS, AND CHIMNEYS. Every foundation, wall, roof, chimney and all exterior surfaces of buildings and structures shall be maintained in structurally sound condition and shall provide weather protection. All wood showing evidence of termite damage or decay, where structural or functional integrity is impaired, shall be replaced. |
| 09/12/2013 | T.C. Ch. 16, Sec. 16-11(f)(6) All repair work shall be done in a workman like manner. |
Outstanding Inspections
Case Number: T13DV06565
Case Status: COMPLIAN
Case Description: MULTIPLE TYPES
Total Outstanding Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/14/2013 | NPO - EXT. BUILDING MAINTENANC | RMENDOZA | Item closed | |
| 11/14/2013 | NPO - INT. BUILDING MAINTENANC | RMENDOZA | Item closed |
Completed Inspections
Case Status: COMPLIAN
Case Number: T13DV06565
Case Description: MULTIPLE TYPES
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/09/2013 | INSP - INITIAL CODE ENFORCMENT | RMENDOZA | Approved | Roof is leaking into shop area. Signs of leaks coming through old repairs throughout the interior. Staining and cracked drywall joints throughout. |
| 11/14/2013 | INSP - FOLLOW UP CODE ENFORCE | RMENDOZA | Approved | Roof repair complete. |
Completed Activity Special Conditions
Case Description - MULTIPLE TYPES
Case Number - T13DV06565
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 4
| Date | Name |
| 09/12/2013 | CONTACTED IN PERSON |
| 09/13/2013 | CONTACTED BY MAILING |
| 09/13/2013 | NOTICE OF VIOLATION ISSUED |
| 11/18/2013 | VIOLATION CLOSED |