Case: T13DV04575
Case Details
Entered Date:
07/01/2013
Applicant:
JOHN & LORNA J. HALLAM
Description:
COMMUNICATION CALLED THAT T.F.D. ON SITE WITH A BEDROOM FIRE, ALARM # 131780238
Outstanding Inspections
Case Number: T13DV04575
Case Status: COMPLIAN
Case Description: RESIDENTIAL FIRE
Total Outstanding Inspections - 12
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/06/2013 | NPO(EL)-MAIN/PANEL/SUB/DISCONT | ASMITH | Follow-up inspection | |
| 12/06/2013 | NPO(EL)-WIRING/SWITCH/OUTLT/FX | ASMITH | Follow-up inspection | |
| 12/06/2013 | NPO(PL)-PLUMBING SYSTEM & FX | ASMITH | Follow-up inspection | |
| 12/06/2013 | NPO(PL)-GAS SUPPLY/CONNECT | ASMITH | Follow-up inspection | |
| 12/06/2013 | NPO(PL)-WATER HEATERS | ASMITH | Follow-up inspection | |
| 12/06/2013 | NPO(HC)-COOLING | ASMITH | Follow-up inspection | |
| 12/06/2013 | NPO(HC)-HEATING & VENTILATION | ASMITH | Follow-up inspection | |
| 12/06/2013 | NPO - EGRESS | ASMITH | Follow-up inspection | |
| 12/06/2013 | NPO - SMOKE ALARMS | ASMITH | Follow-up inspection | |
| 12/06/2013 | NPO - EXT. BUILDING MAINTENANC | ASMITH | Follow-up inspection | |
| 12/06/2013 | NPO - WORK WITHOUT PERMIT | ASMITH | Follow-up inspection | |
| 12/06/2013 | NPO - INT. BUILDING MAINTENANC | ASMITH | Follow-up inspection |
Completed Inspections
Case Status: COMPLIAN
Case Number: T13DV04575
Case Description: RESIDENTIAL FIRE
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2013 | INSP - INITIAL CODE ENFORCMENT | RVIDAL | Approved | Received a call from communication that T.F.D. on site with a bedroom fire. Arrived the units were checking for hot spots and starting the overhaul. The fire investigators were on site checking for the cause. The fire started on the front southwest bedroom and went into the hallway. The bedroom was all burned up with the hallway having the closets burned up also. The other bedroom on the southeast side that was next to the front bedroom had the door closed and was not damaged other than smoke. The bathroom was burned also and the ceiling was pulled down to check for fire. The Red Cross was called to the site and the owner was placed in a hotel. The owner gave permission to have the property secured once the investigation was completed. The owner was worried about his keys and they were not needed due to able to lock the front door and go out the window that burned and was going to be secured with plywood. The only opening that needed to be secured was the front window with all the other openings being able to secure due to no damage to the doors and windows. Did the posting and the owner signed all the paper work before leaving the site to the hotel. Will check in 45 days. RV. |
| 12/06/2013 | INSP - FOLLOW UP CODE ENFORCE | ASMITH | Approved | Last inspection done 12-03-13 working on final. |
Completed Activity Special Conditions
Case Description - RESIDENTIAL FIRE
Case Number - T13DV04575
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 17
| Date | Name |
| 08/12/2013 | CONTACTED BY PHONE |
| 02/10/2014 | CONTACTED IN PERSON |
| 10/01/2013 | CONTACTED BY MAILING |
| 09/25/2014 | PROCESS SERVED |
| 09/25/2013 | STOP WORK ORDER ISSUED |
| 07/24/2013 | NOTICE OF VIOLATION ISSUED |
| 09/22/2014 | CITATION ISSUED |
| 10/02/2013 | PERMIT ISSUED - T##XX##### |
| 12/22/2015 | VIOLATION CLOSED |
| 09/25/2014 | COURT HEARING INFO |
| 04/10/2014 | SEC LETTER OF BILLING FOR $??? SENT TO OWNERS |
| 07/24/2013 | STRUCTURE SECURED BY ??? |
| 07/24/2013 | CALLBACK |
| 09/27/2013 | REINSPECTION FEE - FIRST |
| 04/28/2014 | REINSPECTION FEE - SECOND |
| 09/22/2014 | REINSPECTION FEE - THIRD |
| 10/04/2013 | REINSP LETTER SENT |