Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T13DV02928
Case Details
Entered Date:
05/06/2013
Applicant:
ROBIN D O NEAL
Description:
IMPROPER PIPING USED FOR WATER. TRENCHES STILL OPEN, WORK WITHOUT PERMITS
Case Violations
Case Number: T13DV02928
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Violations: 2
| Violation Date | Code Statue |
|---|---|
| 05/20/2013 | T.C. Ch. 16, Sec. 16-11(e) PLUMBING SYSTEMS. (3) All plumbing systems are to be maintained safe and hazard free and in a state of good repair. Every dwelling or dwelling unit shall have an adequate potable water supply. Every plumbing fixture, water and waste-pipe, and gas connection shall be properly installed in accordance with all applicable laws and maintained in good and sanitary working condition so as to prevent structural deterioration or health hazards, and are to be free from leaks and obstructions. |
| 05/20/2013 | T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe. |
Outstanding Inspections
Case Number: T13DV02928
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Outstanding Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2014 | NPO(PL)-PLUMBING SYSTEM & FX | VALDEZ | Item closed | |
| 11/20/2014 | NPO - WORK WITHOUT PERMIT | VALDEZ | Item closed |
Completed Inspections
Case Status: COMPLIAN
Case Number: T13DV02928
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2013 | INSP - INITIAL CODE ENFORCMENT | BWIESE | Approved | Stop work order in effect. Excavation on site and water lines being replaced. I spoke to property manager on phone. Permit must be secure prior to continuation of repairs. Sending NOV |
| 11/20/2014 | INSP - FOLLOW UP CODE ENFORCE | VALDEZ | Approved | FINAL INSPECTION WAS FINAL. CLOSE CASE |
Completed Activity Special Conditions
Case Description - WORK WITHOUT PERMITS-RESIDENTL
Case Number - T13DV02928
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 9
| Date | Name |
| 10/09/2014 | CONTACTED BY PHONE |
| 05/21/2013 | CONTACTED BY MAILING |
| 05/24/2013 | CERTIFIED RECEIPT CARD |
| 05/21/2013 | NOTICE OF VIOLATION ISSUED |
| 05/08/2014 | CITATION ISSUED |
| 11/20/2014 | VIOLATION CLOSED |
| 05/08/2014 | COURT HEARING INFO |
| 07/23/2013 | REINSPECTION FEE - FIRST |
| 08/26/2013 | REINSPECTION FEE - SECOND |