Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T13DV02170
Case Details
Entered Date:
04/05/2013
Applicant:
ARNE B. & CAROL B. GUSTAFSON JT/RS
Description:
Leak in the ceiling and the walls of the bathroom. Bathroom ceiling collapsed this morning. Only one bathroom inside the unit. Electricy issues throughout the hall way, bedrooms, and bathroom. Exposed wire in the bedroom. Water is turned off for repairs. Management has not offered another unit for the family of three to stay in.
Case Violations
Case Number: T13DV02170
Case Status: COMPLIAN
Case Description: RES: MINIMUM HOUSING
Total Violations: 2
| Violation Date | Code Statue |
|---|---|
| 04/08/2013 | T.C. Ch. 16, Sec. 16-11(e) PLUMBING SYSTEMS. (1) Dwelling units shall be provided with one or more bathrooms equipped with a water closet, lavatory, and either a bathtub or shower. The number of water closets and lavatories for commercial buildings shall be determined by the International Building Code based on the use of the building. Each sink, bathtub and shower shall have hot and cold running water as necessary for its normal operation and use. |
| 04/08/2013 | T.C. Ch. 16, Sec. 16-11(f)(5) All interior coverings, finishes, surfaces including walls, ceilings and floors shall be maintained in a good, clean and sanitary condition. Peeling, chipping, flaking or abraded paint shall be repaired, removed or covered. All walls, ceilings or floors shall be free from holes, breaks and loose or rotting materials. Cracked or loose plaster, wallboard, decayed wood or other defective surface conditions shall be corrected. |
Outstanding Inspections
Case Number: T13DV02170
Case Status: COMPLIAN
Case Description: RES: MINIMUM HOUSING
Total Outstanding Inspections - 3
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/24/2013 | NPO(EL)-WIRING/SWITCH/OUTLT/FX | MLOPEZ | Item closed | |
| 04/24/2013 | NPO(PL)-PLUMBING SYSTEM & FX | MLOPEZ | Item closed | |
| 04/24/2013 | NPO - INT. BUILDING MAINTENANC | MLOPEZ | Item closed |
Completed Inspections
Case Status: COMPLIAN
Case Number: T13DV02170
Case Description: RES: MINIMUM HOUSING
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/05/2013 | INSP - INITIAL CODE ENFORCMENT | MLOPEZ | Approved | Elecrical has been repaired, still lacking ceiling in restroom manager has turned off water to do repairs will place tenant in hotel till repairs are done. issued a 30 day notice and took pic. and post unfit for human occupancy. follow up 05-13-2013 |
| 04/24/2013 | INSP - FOLLOW UP CODE ENFORCE | MLOPEZ | Approved | All violation abated will be closing this case. |
Completed Activity Special Conditions
Case Description - RES: MINIMUM HOUSING
Case Number - T13DV02170
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 6
| Date | Name |
| 04/08/2013 | CONTACTED IN PERSON |
| 04/08/2013 | CONTACTED BY MAILING |
| 04/08/2013 | NOTICE AND ORDER ISSUED |
| 04/08/2013 | NOTICE OF VIOLATION ISSUED |
| 05/13/2013 | VIOLATION CLOSED |
| 04/08/2013 | 8-5 CITY COMM EMERGENCY |