Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T13DV01912
Case Details
Entered Date:
03/28/2013
Applicant:
RIDGEWOOD APARTMENTS LLC
Description:
Emergency Call-out
Case Violations
Case Number: T13DV01912
Case Status: COMPLIAN
Case Description: EMERGENCY
Total Violations: 2
Violation Date | Code Statue |
---|---|
04/01/2013 | T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe. |
04/01/2013 | T.C. Ch. 16, Sec. 16-12(a)(3) BOARDED WINDOW OR DOOR OPENINGS. a. No occupied structure may have boarded window or door openings, except as necessary on a temporary basis to keep the structure secure while under repair. b. While vacant structures may temporarily be secured by boarding up window and door openings in accordance with section 16-14(b), having or maintaining boarded window or door openings on a vacant structure for 180 days or more in any one-year period is prohibited. |
Outstanding Inspections
Case Number: T13DV01912
Case Status: COMPLIAN
Case Description: EMERGENCY
Total Outstanding Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/03/2013 | NPO - BOARDING EXCEEDING 180 D | ASMITH | Item closed | |
10/22/2013 | NPO - WORK WITHOUT PERMIT | ASMITH | Item closed |
Completed Inspections
Case Status: COMPLIAN
Case Number: T13DV01912
Case Description: EMERGENCY
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/28/2013 | INSP - INITIAL CODE ENFORCMENT | MLOPEZ | Approved | Was called out on emergency call, found that three unit had burnt, TFD advised that redcross was only going to have one family placed Utilties were disconnected and that property needed to be boarded. Issued notice to the onsite manager who asked city to board the unit's. will be ref. case to area inspector. |
10/22/2013 | INSP - FOLLOW UP CODE ENFORCE | ASMITH | Approved | All inspection are final case is closed. |
Completed Activity Special Conditions
Case Description - EMERGENCY
Case Number - T13DV01912
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 6
Date | Name |
04/01/2013 | CONTACTED IN PERSON |
04/04/2013 | NOTICE OF VIOLATION ISSUED |
07/10/2013 | PERMIT ISSUED - T##XX##### |
10/22/2013 | VIOLATION CLOSED |
02/26/2014 | SEC LETTER OF BILLING FOR $??? SENT TO OWNERS |
04/01/2013 | STRUCTURE SECURED BY ??? |