Case: T13DV01382
Case Details
Entered Date:
03/11/2013
Applicant:
PIMATUC REALTY ASSOCIATES
Description:
APT FIRE
Outstanding Inspections
Case Number: T13DV01382
Case Status: COMPLIAN
Case Description: FIRE AT COMMERCIAL BUILDING
Total Outstanding Inspections - 5
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/2013 | NPO(EL)-MAIN/PANEL/SUB/DISCONT | AVINDIOL | Item closed | |
| 09/30/2013 | NPO(PL)-GAS SUPPLY/CONNECT | AVINDIOL | Item closed | |
| 09/30/2013 | NPO - EXT. BUILDING MAINTENANC | AVINDIOL | Item closed | |
| 09/30/2013 | NPO - WORK WITHOUT PERMIT | AVINDIOL | Item closed | |
| 09/30/2013 | NPO - INT. BUILDING MAINTENANC | AVINDIOL | Item closed |
Completed Inspections
Case Status: COMPLIAN
Case Number: T13DV01382
Case Description: FIRE AT COMMERCIAL BUILDING
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/10/2013 | INSP - INITIAL CODE ENFORCMENT | GGOODMAN | Approved | MANAGER: ECHO CASNAVE (623-595-4793) TENANTS: KETAHIA DOUK (652-370-2566) MAINTANENCE SUPERVISOR:KEN SIEBERT (203-4156) VISITED SITE, MET WITH TFD INVESTIGATORS AND S/W GAS TECHNICIAN. POWER HAD BEEN TURNED OFF BY TFD/TEP AND GAS SHUT OFF BY S/W GAS TO THE ENTIRE BUILDING (16 UNITS) DUE TO FIRE IN UNIT #248. FIRE STARTED ON THE REAR SECOND STORY PORCH AND ENTERED THE INTERIOR OF THE LIVINGROOM AREA. FIRE AND SMOKE DAMAGE TO THE ONE BEDROOM UNIT WAS SIGNIFICANT AND REQUIRED A EMERGENCY SHUT DOWN: >REAR PORCH ROOF SHEATHING, 2X6 RAFTERS, FACIA AND BEARING 2X10, AND RAILINGS WERE ALL FIRE DAMAGED BEYOND REPAIR. > INTERIOR CEILING DRYWALL AND REAR BEARING WALL DRYWALL WERE ALSO FIRE DAMAGED AND PARTIALLY REMOVED FROM THE WALL AND CEILING. >TOP CORDS OF (3) TRUSSES WERE FIRE DAMAGED ALONG WITH TRUSS BLOCKING AND ROOF SHEATING 4 FT UP FROM REAR BEARING WALL. LARGE 3X8 HOLE CUT IN ROOF BY TFD. >ELECTRICAL WIRING INSIDE THE CEILING AREA WAS ALSO FIRE DAMAGED ALONG WITH OUTLETS AND FIXTURES. WIRING LEFT EXPOSED. >GAS WAS SHUT OFF TO THE COMPLEX BUT FED ONLY THE STOVE TOP (ONLY GAS APPLIANCE). GAS WAS LEFT OFF TO THE COMPLEX UNITS DID HAVE MICROWAVES FOR COOKING. INSPECTION FOUND EACH UNIT HAD A SUB PANEL IN EACH BATHROOM. POWER WAS SHUT OFF TO THE MAIN SERVICE PANEL BY TFD AND THEN TEP SHUT DOWN THE MAIN DISCONNECT. POWER TO UNIT # 248 WAS ISOLATED AT THE INTERIOR SUB PANEL AND WITH THE HELP OF MAINTANENCE SUPERVISOR KEN SIEBERT, POWER WAS RESTORED TO EACH UNIT ONE BY ONE CHECKING UNITS AS WE WENT. TENANTS WERE ALLOWED TO ENTER UNIT TO BEGIN REMOVING BELONGINGS AND WILL BE BUT UP IN UNIT #138 BY MANAGEMENT. BATHCREST WAS CALLED TO SECURE SLIDING GLASS DOOR ON THE BALCONY (PER MANAGEMENT) TO HELP SECURE PERSONAL BELONGINGS. |
| 09/27/2013 | INSP - FOLLOW UP CODE ENFORCE | AVINDIOL | Approved | 09/27/13 ON SITE AGAIN MET WITH MANANGER OF PROPERTY AND MAINT MAN // ALL WAS COMPLETED AND PERMIT T13CM03104 ALL FINALED // WILL MOVE TO CLOSE OUT THIS CASE // AV |
Completed Activity Special Conditions
Case Description - FIRE AT COMMERCIAL BUILDING
Case Number - T13DV01382
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 4
| Date | Name |
| 03/11/2013 | NOTICE AND ORDER ISSUED |
| 03/11/2013 | NOTICE OF VIOLATION ISSUED |
| 09/27/2013 | VIOLATION CLOSED |
| 01/02/2014 | SEC LETTER OF BILLING FOR $??? SENT TO OWNERS |