Case: T12DV11027
Case Details
Entered Date:
12/10/2012
Applicant:
GC BROWN DEVELOPERS INC
Description:
Bathroom plumbing issues with bathroom according to Patron.
Case Violations
Case Number: T12DV11027
Case Status: COMPLIAN
Case Description: COMMERCIAL ZONING
Total Violations: 1
| Violation Date | Code Statue |
|---|---|
| 12/21/2012 | T.C. Ch. 16, Sec. 16-11(e) PLUMBING SYSTEMS. (1) Dwelling units shall be provided with one or more bathrooms equipped with a water closet, lavatory, and either a bathtub or shower. The number of water closets and lavatories for commercial buildings shall be determined by the International Building Code based on the use of the building. Each sink, bathtub and shower shall have hot and cold running water as necessary for its normal operation and use. |
Outstanding Inspections
Case Number: T12DV11027
Case Status: COMPLIAN
Case Description: COMMERCIAL ZONING
Total Outstanding Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/21/2012 | NPO(PL)-PLUMBING SYSTEM & FX | WNAVARRO | Notice of violation | |
| 12/21/2012 | NPO(PL)-WATER HEATERS | WNAVARRO | Notice of violation |
Completed Inspections
Case Status: COMPLIAN
Case Number: T12DV11027
Case Description: COMMERCIAL ZONING
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/21/2012 | INSP - INITIAL CODE ENFORCMENT | WNAVARRO | Approved | Visited site, inspected, found as follows, no hot water in bathroom facilities, will write nov, expalined to owner |
| 04/19/2013 | INSP - FOLLOW UP CODE ENFORCE | WNAVARRO | Approved | Visited site,inspected, found in compliance, case closed abated |
Completed Activity Special Conditions
Case Description - COMMERCIAL ZONING
Case Number - T12DV11027
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 4
| Date | Name |
| 12/24/2012 | CONTACTED BY MAILING |
| 12/24/2012 | NOTICE OF VIOLATION ISSUED |
| 04/22/2013 | VIOLATION CLOSED |
| 03/18/2013 | RESEARCH |