Case: T12DV09873
Case Details
Entered Date:
10/22/2012
Applicant:
THPI ACQUISITION HOLDINGS LLC ATTN: 3D BROKERAGE
Description:
No proper sewage drainage at location. When the machine is running the bathtub and toilet begin to overflow. Water heater does not work. No hot water since June 2012. Gas was turned on, but water heater is broken.
Outstanding Inspections
Case Number: T12DV09873
Case Status: COMPLIAN
Case Description: RES: MINIMUM HOUSING
Total Outstanding Inspections - 3
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/28/2012 | NPO(PL)-PLUMBING SYSTEM & FX | RVIDAL | Follow-up inspection | |
| 11/28/2012 | NPO(PL)-SEWAGE DISPOSAL (SYS) | RVIDAL | Follow-up inspection | |
| 11/28/2012 | NPO(PL)-WATER HEATERS | RVIDAL | Follow-up inspection |
Completed Inspections
Case Status: COMPLIAN
Case Number: T12DV09873
Case Description: RES: MINIMUM HOUSING
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/01/2012 | INSP - INITIAL CODE ENFORCMENT | RVIDAL | Approved | No one home and left a card on the security door. Will wait for the call. RV. |
| 11/28/2012 | INSP - FOLLOW UP CODE ENFORCE | RVIDAL | Approved | Some work done but not completed and called the management to check on the status. Will call to meet at the site. Will check in 30 days. RV. |
Completed Activity Special Conditions
Case Description - RES: MINIMUM HOUSING
Case Number - T12DV09873
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 1
| Date | Name |
| 03/26/2013 | VIOLATION CLOSED |