Case: T12DV07301
Case Details
Entered Date:
08/20/2012
Applicant:
SPEEDWAY/GREENHILLS LLC % CIRCLE K CORPORATION ATTN: MAS REAL ESTATE SVCS INC
Description:
EMERGENCY CALL / CAR INTO BUILDING
Outstanding Inspections
Case Number: T12DV07301
Case Status: COMPLIAN
Case Description: CAR THROUGH COMMERCIAL BUILDIN
Total Outstanding Inspections - 4
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2012 | NPO(EL)-MAIN/PANEL/SUB/DISCONT | BWIESE | Item closed | |
| 09/18/2012 | NPO(EL)-WIRING/SWITCH/OUTLT/FX | BWIESE | Item closed | |
| 09/18/2012 | NPO - EXT. BUILDING MAINTENANC | BWIESE | Item closed | |
| 09/18/2012 | NPO - INT. BUILDING MAINTENANC | BWIESE | Item closed |
Completed Inspections
Case Status: COMPLIAN
Case Number: T12DV07301
Case Description: CAR THROUGH COMMERCIAL BUILDIN
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2012 | INSP - INITIAL CODE ENFORCMENT | GGOODMAN | Approved | VISITED SITE, MET WITH TPD OFFICERS, MARKETING MANAGER HEATHER NEEDLE (409-4292), MAINTANENCE SUPERVISOR ROBERT HATCHELL (631-3830), AND MARK STOUFFER, CONTRACTOR(401-8577). UPON ARRIVAL I FOUND THAT TPD HAD ALREADY CONTACTED FRONTIER TOWING WHO WAS IN THE PROCESS OF TOWING THE VEHICLE, AND MAINTANENCE WAS REMOVING SOME CABINETS IN THE AFFECTED INTERIOR AREA. I DID FIND AN EXTERIOR JUNCTION BOX PULLED FROM THE WALL, AND BENT CONDUIT IN THE INTERIOR AREA, AND WITH THE CONTRACTOR ISOLATED THAT CIRCUIT WHICH WAS WELL MARKED ON BOTH THE BOXES AND MAIN SERVICE PANEL. CAR DAMAGED THE EXTERIOR STUCCO, EXTERIOR SHEER WALL (1/2" PLYWOOD) AND 2X6 FRAMED WALL AND BOTTOM PLATE. A 7 FT X 7 FT METAL WINDOW ALSO RECEIVED DAMAGE. THE DAMAGED AREA WAS BELOW AN EXISTING BEAM WHERE THE ORIGINAL STORE OPENING HAD BEEN FRAMED, AND SINCE CHANGED. THE OLD OPENING HAD BEEN FRAMED IN BELOW THE BEAM AND THEREFORE DAMAGE WAS LIMITED TO THE AREA BELOW THE BEAM AND DID NOT AFFECT THE ROOF SYSTEM. CRACKING OF THE STUCCO STOPPED AT THE BEAM. INTERIOR DRYWALL WAS ALSO DAMAGED. MAINTANENCE SUPERVISOR CONTACTED THEIR WINDOW COMPANY TO REPLACE DAMAGED GLASS INORDER TO SECURE THE STORE, AND LATER WOULD REPLACE THE ENTIRE FRAME. CONTRACTOR MARK STOUFFER MENTIONED THAT HE WOULD BE IN TOMORROW 8/20/12 TO CUT AND REMOVE THE STUCCO, REFRAME THE OPENING INCLUDING SHEER WALL, AND LATER REPLACE THE WINDOW. WITH THIS PROCESS THE BUILDING WILL BE SECURED AT ALL TIMES. NOV AND INDEMNIFICATION WAS ISSUED AND SIGNED FOR BY CIRLCE K CORP PERSONNAL. HEATHER NEEDLE (MARKET MANAGER) 520-409-4292 ROBERT HATCHELL (MAINTANENCE SUPERVISOR) 631-3830 MARK STOUFFER (CONTRACTOR/ CL STOUFFER) 520-322-0844 MARK 520-401-8577 |
| 09/18/2012 | INSP - FOLLOW UP CODE ENFORCE | BWIESE | Approved | 09/18/2012 repair permit T12CM05126 Finaled Close Case |
Completed Activity Special Conditions
Case Description - CAR THROUGH COMMERCIAL BUILDIN
Case Number - T12DV07301
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 3
| Date | Name |
| 08/20/2012 | NOTICE AND ORDER ISSUED |
| 08/20/2012 | NOTICE OF VIOLATION ISSUED |