Case: T12DV07054
Case Details
Entered Date:
08/14/2012
Applicant:
MAHMOOD BASHARAT & NIGHAT JT/RS
Description:
TPD REQUEST/ CAR INTO BUILDING UNIT #2
Case Violations
Case Number: T12DV07054
Case Status: COMPLIAN
Case Description: CAR THROUGH COMMERCIAL BUILDIN
Total Violations: 3
| Violation Date | Code Statue |
|---|---|
| 08/14/2012 | T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe. |
| 08/14/2012 | T.C. Ch. 16, Sec. 16-11(e) PLUMBING SYSTEMS. (1) Dwelling units shall be provided with one or more bathrooms equipped with a water closet, lavatory, and either a bathtub or shower. The number of water closets and lavatories for commercial buildings shall be determined by the International Building Code based on the use of the building. Each sink, bathtub and shower shall have hot and cold running water as necessary for its normal operation and use. |
| 08/14/2012 | T.C. Ch. 16, Sec. 16-11(g) INTERIOR SANITATION. (1) The interior of every building or structure shall be maintained free from any unsafe or unsanitary accumulation of refuse. (2) All sanitary facilities shall be installed and maintained in a safe and sanitary condition. (3) Every dwelling unit must have a kitchen, which shall include a sink. Sink drain boards and countertops adjacent to the kitchen sink shall be made of non-absorbent materials, or must be covered by a non-absorbent material. |
Outstanding Inspections
Case Number: T12DV07054
Case Status: COMPLIAN
Case Description: CAR THROUGH COMMERCIAL BUILDIN
Total Outstanding Inspections - 7
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/13/2012 | NPO(EL)-MAIN/PANEL/SUB/DISCONT | GGOODMAN | Item closed | |
| 08/13/2012 | NPO(EL)-WIRING/SWITCH/OUTLT/FX | GGOODMAN | Item closed | |
| 08/13/2012 | NPO(PL)-PLUMBING SYSTEM & FX | GGOODMAN | Item closed | |
| 08/13/2012 | NPO(PL)-WATER HEATERS | GGOODMAN | Item closed | |
| 11/16/2012 | NPO - REFUSE/TRASH/DEBRIS | ESTEVENS | Follow-up inspection | |
| 11/16/2012 | NPO - EXT. BUILDING MAINTENANC | ESTEVENS | Follow-up inspection | |
| 11/16/2012 | NPO - INT. BUILDING MAINTENANC | ESTEVENS | Follow-up inspection |
Completed Inspections
Case Status: COMPLIAN
Case Number: T12DV07054
Case Description: CAR THROUGH COMMERCIAL BUILDIN
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2012 | INSP - INITIAL CODE ENFORCMENT | GGOODMAN | Approved | VISITED SITE, MET WITH TPD OFFICERS WHO METIONED THE TEAL MITSUBISHI, DIAMANTE, WAS HEADING NORTH ON FLOWING WELLS, CROSSED TRAFFIC, HIT A CITY LIGHT POLE, PROCEEDED FORWARD, HIT A LIGHT BLUE CHEVY IMPALA THEN PROCEEDED INTO THE WEST BRICK WALL OF APT #2. IN THE PROCESS IT PUSHED A CONCRETE CURB STOP FORWARD INTO A MAIN WATER LINE, BREAKING THE GALVANIZED LINE. WATER WAS SHUT OFF BY MANAGER NINA KOPEC IN TURN SHUTTING OFF WATER TO THE NORTH SIDE, EIGHT UNITS OF THE 14 UNIT COMPLEX. NINA HAD ALSO CONTACTED SPARTAN PLUMBING TO MAKE PLUMBING REPAIRS. NINA CONTACTED THE OWNER TWICE AND NEVER RECEIVED AN ANSWER BACK. DOORS TO THE UNIT WERE LOCKED HOWEVER FRONT WINDOW HAD BEEN BROKEN OUT. TPD ENTERED THE UNIT AND UNLOCKED FRONT DOOR, ALLOWED ENTRY AFTER CHECKING THE UNIT. INSIDE I FOUND CABINETS DIPLACED, UPPER CABINETS DAMAGED BUT NOT YET OFF THE WALLS. WATER HEATER CABINET PUSHED AWAY FROM THE WALL, HOT WATER HEATER TILTED BUT NOT FALLEN (HELD UPRIGHT BY THE PLUMBING LINES) INTERIOR BRICK DOUBLE BRICK WALL WAS OBVIOUSLY PUSHED INWARDS, DISPLACED BY 1/12 INCHES. CAR WAS REMOVED BY FRONTIER TOWING, CITY OF TUCSON WAS CONTACTED TO REMOVE THE LIGHT POLE, CAME OUT AND WOULD NEED TO RETURN MONDAY. SPARTAN PLUMBING ARRIVED, DID NOT HAVE NECESSARY EQUIPMENT AND WOULD NEED TO COME BACK ON MONDAY. THEREFORE INSPECTOR CONTACTED RED CROSS AFTER DETERMINING HOW MANY UNITS WOULD REQUIRE ASSISTANCE AND HOW MANY PEOPLE. RED CROSS DID COME OUT, GOT EVERBODY TOGETHER GAVE THEM THE OPTION OF STAYING WERE THEY WERE AT OR BEING HOUSED AT THEIR EMERGENCY FACILITY WHICH HAD NO SHOWERS. ALL ELECTED TO STAY, RED CROSS PROVIDED EACH UNIT WATER, WATER FOR THE COOLERS WAS PROVIDED BY UNITS ACROSS THE WAY. NOV ISSUED TO UNIT TWO FOR EMERGENCY ABATED DUE TO WATER, DAMAGED WEST WALL AND UNSANITARY CONDITIONS. NOV POSTED WITH "KEEP VACANT" POSTING. MANAGER NINA KOPAEC SIGNED FOR NOV AND INDEMNIFICATION, ELECTED TO BOARD THE WINDOW. TENANT IN UNIT #2 WAS PRESENTLY IN THE HOSPITAL. |
| 11/16/2012 | INSP - FOLLOW UP CODE ENFORCE | ESTEVENS | Approved | At site, spoke to owner/manager, Sal. Told me he is keeping unit vacant until he repairs the other units. The other units are under a court compliance deadline. Inspected other units for court compliance. F/U 60 days. |
Completed Activity Special Conditions
Case Description - CAR THROUGH COMMERCIAL BUILDIN
Case Number - T12DV07054
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 5
| Date | Name |
| 08/15/2012 | CONTACTED BY MAILING |
| 08/15/2012 | NOTICE OF VIOLATION ISSUED |
| 06/24/2013 | VIOLATION CLOSED |
| 02/22/2013 | RESEARCH |
| 08/15/2012 | CALLBACK |