Case: T12DV05906
Case Details
Entered Date:
07/16/2012
Applicant:
ADC WEST, LLC
Description:
Resident is operating a leasing/management business on site. Has been for 5 years. A wall between the properties to allow for this business was approved, but never built. An increase in traffic has been noticed by neighbors. If the wall had been built as promised, the traffic would not be as bad.
Case Violations
Case Number: T12DV05906
Case Status: COMPLIAN
Case Description: COMMERCIAL ZONING
Total Violations: 3
| Violation Date | Code Statue |
|---|---|
| 07/19/2012 | UDC, Sec. 10.3.5. VIOLATION OF A SITE PLAN Failure to comply with conditions placed on an approved site plan shall constitute a violation of the UDC. |
| 03/13/2013 | T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe. |
| 03/13/2013 | T.C. Ch. 16, Sec. 16-13(b) ACCUMULATION OF REFUSE PROHIBITED. Each owner, lessee, tenant, resident or occupant shall maintain a property so it is free of accumulated refuse and debris. Accumulated refuse and debris means contained or uncontained refuse and debris that is present on the property in a manner not authorized by the Tucson Code. Material recycling facilities meeting the requirements of section 15-24.7 are exempt from this prohibition. |
Outstanding Inspections
Case Number: T12DV05906
Case Status: COMPLIAN
Case Description: COMMERCIAL ZONING
Total Outstanding Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/19/2012 | LUC - VIOL OF SITE PLAN - COND | BWIESE | Notice of violation |
Completed Inspections
Case Status: COMPLIAN
Case Number: T12DV05906
Case Description: COMMERCIAL ZONING
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/19/2012 | INSP - INITIAL CODE ENFORCMENT | BWIESE | Approved | Perimeter wall was never built as required by zoning. Posted Note. Spoke to manager Sending NOV |
| 05/20/2013 | INSP - FOLLOW UP CODE ENFORCE | BWIESE | Approved | T13CM02218 IS ISSUED & APPROVED. Perimeter wall has been completed. |
Completed Activity Special Conditions
Case Description - COMMERCIAL ZONING
Case Number - T12DV05906
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 4
| Date | Name |
| 03/14/2013 | CONTACTED BY PHONE |
| 07/23/2012 | CONTACTED BY MAILING |
| 07/23/2012 | NOTICE OF VIOLATION ISSUED |
| 07/19/2013 | VIOLATION CLOSED |