Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T12DV02135
Case Details
Entered Date:
03/20/2012
Applicant:
EMPIRE TERRACE LLC 50.0481% & RMA385 PRTNRS LLC 49.9519%
Description:
H16 Unit, A hole in roof above the water heater. Asked on three separate occasions (starting in December 2011) for management to fix it. Campbell Ranch Apartments only patched the collapsing ceiling inside, and have still failed to fix the actual hole. With every rain it leaks into electrical.
Case Violations
Case Number: T12DV02135
Case Status: COMPLIAN
Case Description: RES: MINIMUM HOUSING
Total Violations: 1
Violation Date | Code Statue |
---|---|
04/03/2012 | T.C. Ch. 16, Sec. 16-12(b)(3) ROOFS. The roof of every building or structure shall be maintained in a safe condition and shall provide weather protection for that building or structure. Roof coverings shall not be rotted, broken, split, buckled or otherwise deteriorated. T.C. Ch. 16, Sec. 16-12(b) FOUNDATIONS, WALLS, ROOFS, AND CHIMNEYS. Every foundation, wall, roof, chimney and all exterior surfaces of buildings and structures shall be maintained in structurally sound condition and shall provide weather protection. All wood showing evidence of termite damage or decay, where structural or functional integrity is impaired, shall be replaced. |
Outstanding Inspections
Case Number: T12DV02135
Case Status: COMPLIAN
Case Description: RES: MINIMUM HOUSING
Total Outstanding Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/30/2012 | NPO(EL)-WIRING/SWITCH/OUTLT/FX | JHURD | Item closed | |
04/19/2012 | NPO - INT. BUILDING MAINTENANC | JHURD | Item closed |
Completed Inspections
Case Status: COMPLIAN
Case Number: T12DV02135
Case Description: RES: MINIMUM HOUSING
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/30/2012 | INSP - INITIAL CODE ENFORCMENT | JHURD | Approved | VISITED SITE: TALKED WITH MANAGER CHASITY, WENT OVER ISSUES, CHASITY LOOKED UP ON WORK ORDERS STATED HAVE DONE WORK IN FEB. ON CEILING LEAK. NO OTHER ISSUE OF STILL LEAKING. WILL SEND MAINT. TO SEE WHAT IS GOING ON. TALKED W/MAINT. STATED ROOF IS BAD NEEDS CONTRACTOR TO REPAIR. N/O/V ROOF REPAIR. 30 DAYS. |
04/19/2012 | INSP - FOLLOW UP CODE ENFORCE | JHURD | Approved | OFFICE FOLLOW UP: TALKED WITH MANAGER CHARITY. WENT OVER ROOF LEAKING ISSUE. H-16. WORK HAS BEEN COMPLETED ABSOLUTE ROOFING SOLUTIONS. 4/18/12. FAXED A COPY OF WORK COMPLETED AND BILL. IN FILE COMPLIANT @ THIS TIME. CLOSE/CASE. |
Completed Activity Special Conditions
Case Description - RES: MINIMUM HOUSING
Case Number - T12DV02135
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 4
Date | Name |
04/19/2012 | CONTACTED BY PHONE |
04/09/2012 | CONTACTED BY MAILING |
04/09/2012 | NOTICE OF VIOLATION ISSUED |
04/19/2012 | VIOLATION CLOSED |