Case: T12DV01650
Case Details
Entered Date:
03/02/2012
Applicant:
MADRID LINDA C
Description:
ADDING ONTO EXTERIOR OF HOME W/O PERMITS.
Case Violations
Case Number: T12DV01650
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Violations: 1
| Violation Date | Code Statue |
|---|---|
| 03/19/2012 | T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe. |
Outstanding Inspections
Case Number: T12DV01650
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Outstanding Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2012 | NPO - WORK WITHOUT PERMIT | RVIDAL | Item closed |
Completed Inspections
Case Status: COMPLIAN
Case Number: T12DV01650
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/13/2012 | INSP - INITIAL CODE ENFORCMENT | RVIDAL | Approved | MET WITH THE OWNER AND SHE BUILT THE PORCH EXTENSION ON THE FRONT BY THE CARPORT AND FRONT DOOR. THE CARPORT HAS BEEN ENCLOSED TO A ROOM AND CONNECTED TO THE HOUSE. THE ROOM IS NOT COMPLETED BUT THE DRYWALL HAS BEEN INSTALLED. THE PORCH IS LACKING THE FRAMING CLIPS AND POST AND BEAM CONNECTORS. SHE WILL BE CALLING THE BUILDER TO CHECK IF HE CAN HELP ON THE DRAWINGS FOR THE PERMIT. LET HER KNOW THAT THE N.O.V. WILL BE SENT AND GIVEN 45 DAYS TO GET THE PERMIT. WILL DO N.O.V. RV. |
| 09/24/2012 | INSP - FOLLOW UP CODE ENFORCE | RVIDAL | Approved | Office Follow Up: Permit has been approved, T12CM01952 on 8-13-13. At this time have not other issues and the case will be closed. Violation Abated, Close Case. RV. |
Completed Activity Special Conditions
Case Description - WORK WITHOUT PERMITS-RESIDENTL
Case Number - T12DV01650
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 4
| Date | Name |
| 03/20/2012 | CONTACTED BY MAILING |
| 03/20/2012 | NOTICE OF VIOLATION ISSUED |
| 10/04/2012 | VIOLATION CLOSED |
| 07/19/2012 | RESEARCH |