Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T12DV00082
Case Details
Entered Date:
01/06/2012
Applicant:
DAVID HENRY KENNON JR & MARLENE SUPERSAD
Description:
New closed in porch on west side of building. New windows. New interior work electrical, drywall ect. No permit or historic review.
Outstanding Inspections
Case Number: T12DV00082
Case Status: COURTCMP
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Outstanding Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/14/2012 | LUC - ZONING OTHER | LPUMPHRE | Item closed | |
08/14/2012 | NPO - WORK WITHOUT PERMIT | LPUMPHRE | Item closed |
Completed Inspections
Case Status: COURTCMP
Case Number: T12DV00082
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/10/2012 | INSP - INITIAL CODE ENFORCMENT | LPUMPHRE | Approved | Inspection showed enclosed room attached to west side of property; owner was present and stated siding was applied to previously built room to match main structure. In contrast with 2010 aerial, some windows may have been added and/or removed. Unable to access interior. Research shows cabana permit in this area in 1962 and a permit in 1999 refers to this area as a study. NOV will be issued for failure to obtain historical review for changes in an HPZ zone. |
06/22/2012 | INSP - FOLLOW UP CODE ENFORCE | LPUMPHRE | Approved | Partial compliance; see research. |
Outstanding Case Activity Conditions
Date | Name | Approved |
01/11/2012 | LUC, Sec. 5.5.2.3 COMPLIANCE REVIEW, EXISTING DEVELOPMENT. Any land used or occupied; any site improvement, modification, or construction started; any existing use or structure expanded, reconstructed, changed, or otherwise altered; and any land divided into multiple parcels without certification of compliance with the provisions of the Land Use Code (LUC) through a zoning review process shall be considered a violation of the LUC. Enforcement of violations shall be in accordance with Sec. 5.5.3. LUC, Sec. 2.8.8.5 DEVELOPMENT REVIEW REQUIRED. A. Generally. Review and approval, of all properties, buildings, signs, and structures within the HPZ, are required for all development and improvements, including new construction or improvements which do not require building permits. | Not Approved |
Completed Activity Special Conditions
Case Description - WORK WITHOUT PERMITS-RESIDENTL
Case Number - T12DV00082
Case Status: COURTCMP
Total Completed Case Activity Conditions: 10
Date | Name |
02/27/2012 | CONTACTED BY PHONE |
01/11/2012 | CONTACTED IN PERSON |
04/23/2012 | CONTACTED BY MAILING |
05/14/2012 | CERTIFIED RECEIPT CARD |
01/11/2012 | NOTICE OF VIOLATION ISSUED |
04/23/2012 | CITATION ISSUED |
04/23/2012 | COURT HEARING INFO |
01/11/2012 | RESEARCH |
02/28/2012 | REINSPECTION FEE - FIRST |
04/17/2012 | REINSPECTION FEE - SECOND |