Case Details

Status:

COMPLIAN

Type:

WORK WITHOUT PERMITS-RESIDENTL
Address:

Entered Date:

01/05/2012

Applicant:

GALLEGO MIGUEL L & GLENDA M CP/RS

Description:

ENCLOSED CARPORT, AC SPLIT SYSTEM AND NEW MASONRY WALL ADDED TO THE FRONT OF THE PROPERTY ALL WITH OUT PERMITS

Case Violations

Case Number: T12DV00056
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Violations: 1
Violation Date Code Statue
01/05/2012 T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe.

Outstanding Inspections

Case Number: T12DV00056
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Outstanding Inspections - 1
End Date Description Inspector Results Comments
09/10/2012 NPO - WORK WITHOUT PERMIT RVIDAL Item closed

Completed Inspections

Case Status: COMPLIAN
Case Number: T12DV00056
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Completed Inspections - 2
End Date Description Inspector Results Comments
01/04/2012 INSP - INITIAL CODE ENFORCMENT RVIDAL Approved WHILE DOING ANOTHER INSPECTION FOUND THE HOUSE WITH A NEW MASONRY WALL BUILT IN THE FRONT OF THE PROPERTY. EXISTING CARPORT HAS BEEN ENCLOSED TO LIVING SPACE WITH MASONRY WALLS. NEW AC SPLIT SYSTEM HAS BEEN ADDED TO THE HOUSE AND LACKING TO THE NEW ROOM. DID MEET WITH THE OWNER AND ALL WAS DONE WITH OUT A PERMIT. DID GO OVER WHAT NEEDED TO BE DONE TO SUBMIT FOR THE PERMIT AND TOLD WHERE TO GO TO GET THE PERMIT. LET HIM KNOW THAT THE N.O.V. WILL BE SENT AND GIVEN 45 DAYS TO GET THE PERMIT. WILL DO N.O.V. RV.
09/10/2012 INSP - FOLLOW UP CODE ENFORCE RVIDAL Approved Office Follow Up: Permit has been finaled, T12CM00453 on 8-13-12 and has no other issues on the property. At this the case will be closed. Violation Abated, Close Case.

Completed Activity Special Conditions

Case Description - WORK WITHOUT PERMITS-RESIDENTL
Case Number - T12DV00056
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 5
Date Name
02/22/2012 CONTACTED BY PHONE
01/12/2012 CONTACTED BY MAILING
01/12/2012 NOTICE OF VIOLATION ISSUED
09/20/2012 VIOLATION CLOSED
02/27/2012 RESEARCH