Case Details

Status:

COMPLIAN

Type:

MULTIPLE TYPES

Entered Date:

12/22/2011

Applicant:

FRIEL INVESTMENTS LLC

Description:

Zoned I-1: Office mobile home unit moved onto lot without permit and various other violations with electrical and plumbing. Excessive storage.

Case Violations

Case Number: T11DV10095
Case Status: COMPLIAN
Case Description: MULTIPLE TYPES
Total Violations: 2
Violation Date Code Statue
01/09/2012 T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe.
01/09/2012 UDC, Sec. 10.3.5. VIOLATION OF A SITE PLAN Failure to comply with conditions placed on an approved site plan shall constitute a violation of the UDC.

Outstanding Inspections

Case Number: T11DV10095
Case Status: COMPLIAN
Case Description: MULTIPLE TYPES
Total Outstanding Inspections - 6
End Date Description Inspector Results Comments
01/06/2012 INSP - INITIAL CODE ENFORCMENT ESTEVENS Approved At site, spoke to manager. Explained issue of double wide trailer on property, violation of site plan. Explained getting permits for trailer, NOV and re-inspection fees. F/U 30 days.
07/30/2012 NPO - WORK WITHOUT PERMIT ESTEVENS Follow-up inspection
12/22/2011 LUC - VIOL OF SITE PLAN - COND NNICKOL Item initialized
12/22/2011 NPO(EL)-MAIN/PANEL/SUB/DISCONT NNICKOL Item initialized
12/22/2011 NPO(PL)-GAS SUPPLY/CONNECT NNICKOL Item initialized
12/22/2011 NPO - REFUSE/TRASH/DEBRIS NNICKOL Item initialized

Completed Inspections

Case Status: COMPLIAN
Case Number: T11DV10095
Case Description: MULTIPLE TYPES
Total Completed Inspections - 2
End Date Description Inspector Results Comments
12/22/2011 LUC - ZONING OTHER NNICKOL Approved
07/30/2012 INSP - FOLLOW UP CODE ENFORCE ESTEVENS Approved At site, spoke to Jeff, consultant of owner. Said that Dave trade land with Pima County because of sewer line expansion. Trailer will be relocated. F/U 180 days.

Completed Activity Special Conditions

Case Description - MULTIPLE TYPES
Case Number - T11DV10095
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 5
Date Name
03/09/2012 CONTACTED BY PHONE
01/09/2012 CONTACTED BY MAILING
01/09/2012 NOTICE OF VIOLATION ISSUED
02/08/2013 VIOLATION CLOSED
02/16/2012 RESEARCH

Documents

File Name Document Type  
T11DV10095.PDF DOCUMENTS VIEW