Case: T11DV07523
Case Details
Entered Date:
09/21/2011
Applicant:
WILLIAM F. BUONACCORSI
Description:
Townhouse with ceiling damage on the 2nd floor. Roof leaks - the 2nd floor has a warped ceiling in the hallway and master bedroom. Reported to management and not fixed. Ceiling tiles do not dry out. Has been like this for months.
Case Violations
Case Number: T11DV07523
Case Status: COMPLIAN
Case Description: RES: MINIMUM HOUSING
Total Violations: 2
| Violation Date | Code Statue |
|---|---|
| 10/27/2011 | T.C. Ch. 16, Sec. 16-11(f)(5) All interior coverings, finishes, surfaces including walls, ceilings and floors shall be maintained in a good, clean and sanitary condition. Peeling, chipping, flaking or abraded paint shall be repaired, removed or covered. All walls, ceilings or floors shall be free from holes, breaks and loose or rotting materials. Cracked or loose plaster, wallboard, decayed wood or other defective surface conditions shall be corrected. |
| 10/27/2011 | T.C. Ch. 16, Sec. 16-12(b)(3) ROOFS. The roof of every building or structure shall be maintained in a safe condition and shall provide weather protection for that building or structure. Roof coverings shall not be rotted, broken, split, buckled or otherwise deteriorated. T.C. Ch. 16, Sec. 16-12(b) FOUNDATIONS, WALLS, ROOFS, AND CHIMNEYS. Every foundation, wall, roof, chimney and all exterior surfaces of buildings and structures shall be maintained in structurally sound condition and shall provide weather protection. All wood showing evidence of termite damage or decay, where structural or functional integrity is impaired, shall be replaced. |
Outstanding Inspections
Case Number: T11DV07523
Case Status: COMPLIAN
Case Description: RES: MINIMUM HOUSING
Total Outstanding Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/06/2011 | NPO - INT. BUILDING MAINTENANC | HLOPEZ | Extension granted | 30 day extension |
Completed Inspections
Case Status: COMPLIAN
Case Number: T11DV07523
Case Description: RES: MINIMUM HOUSING
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/2011 | INSP - INITIAL CODE ENFORCMENT | HLOPEZ | Approved | VIOLATION PRESENT Initial site inspection, contact made w/occupant, entry allowed to view ceiling damage of 2nd flr hallway & bd rm. eastside. 2 sections measuring approx. 4'x4' & 4'x6' have been removed & covered w/clear plastic material. Tenant stated water damage caused by recent rains, management just started to address , no other issues apparent. Rest of apt. in good shape. Tenant moving out this wk end. Informed them NOV to be sent to owner & management, 30 days to abate violations, contact # for inspector provided to tenant. |
| 12/06/2011 | INSP - FOLLOW UP CODE ENFORCE | HLOPEZ | Approved | COMPLIANCE INSP. New roofing installed, lacks coating & section of wood shingles has not been addressed, unable to contact owner next door for approval to access roof to complete repairs of wood shingled section. Unit is vacant & secured. 30 day extension due to progress. |
Completed Activity Special Conditions
Case Description - RES: MINIMUM HOUSING
Case Number - T11DV07523
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 4
| Date | Name |
| 12/13/2011 | CONTACTED BY PHONE |
| 11/08/2011 | CONTACTED BY MAILING |
| 11/08/2011 | NOTICE OF VIOLATION ISSUED |
| 01/20/2012 | VIOLATION CLOSED |