Case: T11DV07006
Case Details
Entered Date:
08/31/2011
Applicant:
JOE Y & LORI J LILLEY
Description:
ELECTRICAL ISSUES, OPEN, UNSECURED.
Case Violations
Case Number: T11DV07006
Case Status: COMPLIAN
Case Description: MULTIPLE TYPES
Total Violations: 2
| Violation Date | Code Statue |
|---|---|
| 08/31/2011 | T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe. |
| 08/31/2011 | T.C. Ch. 16, Sec. 16-14(b)(3) ABATEMENT OF VACANT AND UNSECURED BUILDINGS. When ordered abated, a vacant and unsecured building shall be cleaned and secured as follows: a. All accumulated refuse that poses a fire or health hazard within or upon the property or premises shall be removed; and b. All unsecured doorway, windows, or exterior openings shall be barricaded in accordance with standards established by the code official, which shall be kept on file with the city clerk, and in accordance with section 16-12(a)(3) of this chapter; and c. Both the structure and the exterior premises shall be posted with signs that provide reasonable notice prohibiting entry (i.e., "No Trespassing" signs). |
Outstanding Inspections
Case Number: T11DV07006
Case Status: COMPLIAN
Case Description: MULTIPLE TYPES
Total Outstanding Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/29/2011 | NPO(DL)-VACANT & UNSEC.STRUCT | JHURD | Follow-up inspection | 2nd ReInspection Fee Applied |
| 12/29/2011 | NPO - WORK WITHOUT PERMIT | JHURD | Follow-up inspection | 2nd ReInspection Fee Applied |
Completed Inspections
Case Status: COMPLIAN
Case Number: T11DV07006
Case Description: MULTIPLE TYPES
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/30/2011 | INSP - INITIAL CODE ENFORCMENT | JHURD | Approved | VISITED SITE; STRUCTURE OPEN & UNSECURED. PERMANENT SOURCE OF HEAT REMOVED, WALL HEATER, BASE BOARD HEATER INSTALLED. INTERIOR SUB-PANEL REPLACED FROM ORIGINAL. EXPOSED ROMEX. N/O/V 30 DAYS. |
| 12/29/2011 | INSP - FOLLOW UP CODE ENFORCE | JHURD | Approved | VISITED SITE: UNIT OPEN & UNSECURED. NO PERMIT FOR HEATERS. CONDEMED ON 11/17/11 NON-COMPLIANT SEE COND. |
Completed Activity Special Conditions
Case Description - MULTIPLE TYPES
Case Number - T11DV07006
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 6
| Date | Name |
| 09/12/2011 | CONTACTED BY MAILING |
| 09/12/2011 | NOTICE OF VIOLATION ISSUED |
| 10/12/2012 | VIOLATION CLOSED |
| 10/17/2011 | REINSPECTION FEE - FIRST |
| 01/03/2012 | REINSPECTION FEE - SECOND |
| 07/17/2012 | REINSP LETTER SENT |