Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T11DV02501
Case Details
Status:
Citation
Type:
Builidng a patio and a block wall without permits.3/15/12: Complaint received for basketball hoop frame installed into easement right of way area at front of property.
Address:
Entered Date:
04/13/2011
Applicant:
N/A
Description:
Case Violations
Case Number: T11DV02501
Case Status: Citation
Case Description: Builidng a patio and a block wall without permits.3/15/12: Complaint received for basketball hoop frame installed into easement right of way area at front of property.
Total Violations: 1
Violation Date | Code Statue |
---|---|
06/09/2011 | UDC Sec. 10.2.3 COMPLIANCE REVIEW, EXISTING DEVELOPMENT Any land used or occupied; any site improvement, modification, or construction started; any existing use or structure expanded, reconstructed, changed, or otherwise altered; and any land divided into multiple parcels without certification of compliance with the provisions of the UDC through a zoning review process is considered a violation of the UDC. Enforcement of violations shall be in accordance with Section 10.4, Penalties and Remedies. |
Completed Inspections
Case Status: Citation
Case Number: T11DV02501
Case Description: Builidng a patio and a block wall without permits.3/15/12: Complaint received for basketball hoop frame installed into easement right of way area at front of property.
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/23/2011 | COT - ENFC - Code Enforcement - Initial | Passed | {Activity date: 05/23/2011; Status: Approved; Inspector: HLOPEZ; Comment: Entered by HLOPEZ - VIOLATIONS PRESENT Site inspection, abs vent & drain piping stubbed out w/installation of new copper lines leading to side yard along block wall. Contact made w/occupant, stated father was not home & had no information regarding permit. Contacted HCD, no permit on file. Stop work order posted. Provided daughter contact # for insp. & requested contact. Block arch way w/electrical attached to perimeter block wall, 4' block wall at rear yd has been raised to 6 feet. Pillars erected indicated possible porch addition. Research required.} | |
06/12/2012 | COT - ENFC - Code Enforcement - Follow Up | Passed | {Activity date: 06/12/2012; Status: Approved; Inspector: MROMERO; Comment: Entered by MROMERO - In Court for Inspector Lopez. 30 day extension granted. Follow-up July 13, 2012. Hearing July 16, 2012} ; {Activity date: 04/17/2012; Status: Approved; Inspector: HLOPEZ; Comment: Entered by HLOPEZ - Continuance, owner out of town Next court date, 6/12/12 @ 9:00 am} ; {Activity date: 03/19/2012; Status: Approved; Inspector: HLOPEZ; Comment: Entered by HLOPEZ - Attended Court, respondent present. Next Court date 4/17/2012 at 2 PM.} ; {Activity date: 12/06/2011; Status: Approved; Inspector: HLOPEZ; Comment: Entered by HLOPEZ - OWNER CONTACTED INSPECTOR. Resubmitted plans, need to verify dimensions from curb to porch structure, should have permits in issued status by end of week. Case reviewed w/supervisor, approved 30 day extension, due to complex issues & D.D.O. process needed to be worked out.} ; {Activity date: 09/01/2011; Status: Approved; Inspector: HLOPEZ; Comment: Entered by HLOPEZ - CASE MOVING FORWARD See entry in condition screen for details dated 8/26/ & 9/1} ; {Activity date: 07/20/2011; Status: Approved; Inspector: HLOPEZ; Comment: Entered by HLOPEZ - COMPLIANCE INSP. Prior to field inspection, research in COT pp program found no action on permit required. Site inspection, contact made w/owner son. Left message requesting status of project.} |
Completed Case Activity
Case Number - T11DV02501
Case Status: Citation
Case Description: Builidng a patio and a block wall without permits.3/15/12: Complaint received for basketball hoop frame installed into easement right of way area at front of property.
Description | Date | Status |
CERTIFIED RECEIPT CARD | 02/01/2012 | Passed |
CONTACTED BY PHONE | 04/13/2012 | Passed |
RESEARCH | 04/20/2012 | Passed |
CONTACTED IN PERSON | 05/25/2011 | Passed |
COURT HEARING INFO | 06/12/2012 | Passed |
CONTACTED BY MAILING | 06/13/2011 | Passed |