Case: T11DV01998
Case Details
Entered Date:
03/29/2011
Applicant:
ROSALIE HACHENBERG
Description:
Work without permits
Case Violations
Case Number: T11DV01998
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Violations: 2
| Violation Date | Code Statue |
|---|---|
| 03/29/2011 | T.C. Ch. 16, Sec. 16-11(d) MECHANICAL EQUIPMENT. All mechanical equipment and appliances shall be properly installed, maintained in a safe, working, operating condition, and shall be free of any defect that impairs operability. |
| 03/29/2011 | T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe. |
Outstanding Inspections
Case Number: T11DV01998
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Outstanding Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/23/2011 | NPO - WORK WITHOUT PERMIT | ASMITH | Item closed |
Completed Inspections
Case Status: COMPLIAN
Case Number: T11DV01998
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/29/2011 | INSP - INITIAL CODE ENFORCMENT | ASMITH | Approved | installation of split 3.5 ton a/c system permits where never final. |
| 05/19/2011 | INSP - FOLLOW UP CODE ENFORCE | ASMITH | Approved | Permit was given final inspection on 5-17-2011 Case Closed |
Completed Activity Special Conditions
Case Description - WORK WITHOUT PERMITS-RESIDENTL
Case Number - T11DV01998
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 4
| Date | Name |
| 05/10/2011 | CONTACTED IN PERSON |
| 03/30/2011 | CONTACTED BY MAILING |
| 05/19/2011 | VIOLATION CLOSED |
| 03/29/2011 | NOTICE OF VIOLATION ISSUED |