Case: T10FR02089
Case Details
Entered Date:
10/14/2010
Applicant:
LEI WEI-CHUAN & YU HUA SHAO LEI JT/RS
Description:
Tokyo Rice Bowl 10/11/10
Outstanding Inspections
Case Number: T10FR02089
Case Status: COMPLETE
Case Description: INSPECTION
Total Outstanding Inspections - 3
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/14/2010 | VIOL - BUILDING SVCS & SYSTEMS | MPursley | Correction Required | 605.6 Unapproved conditions Open junction boxes and open wiring splices shall be prohibited. Approved covers shall be provided for all switch and outlet covers. _____ Place approved cover(s) over the electrical box |
| 10/14/2010 | VIOL - FIRE PROTECTION SYSTEMS | MPursley | Correction Required | 901.6 Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. ____Fire protection systems and equipment shall be inspected, tested and maintained. Hood Extinguishers |
| 10/14/2010 | VIOL - MEANS OF EGRESS | MPursley | Correction Required | 1008.1.8.4 Bolt locks. Manually operated flush bolts or surface bolts are not permitted. _____ Remove the slide bolt from the back egress door, as bolt lock of any kind are not permitted |
Completed Inspections
Case Status: COMPLETE
Case Number: T10FR02089
Case Description: INSPECTION
Total Completed Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/30/2010 | INSP - REINSPECTION | MPursley | Approved | All corrections made 11/23/10 |