Case: T10FR01780
Case Details
Entered Date:
08/19/2010
Applicant:
CATON COMPANY
Description:
Full/ Fuel SYS
Completed Inspections
Case Status: COMPLETE
Case Number: T10FR01780
Case Description: INSPECTION
Total Completed Inspections - 4
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2010 | INSP - FULL | CFUNKE | Approved | 605.5 Extension cords. Extension cords and flexible cords shall not be a substitute for permanent wiring. - Remove the extension cords. |
| 08/19/2010 | VIOL - MOTOR FUEL DISPENSING | CFUNKE | Approved | 2205.2.3 Leak detectors. Leak detection devices required by Section 2206.7.7.1 shall be checked and tested at least annually in accordance with the manufacturer's specifications to ensure proper installation and operation. " Please provide documentation of test results and ensure all leak detection devices are installed as per the manufacturer. Section 3404.2.12.3 Existing tanks and piping. Existing underground storage tanks and piping shall be tested for leakage at the owner's or operator's expense at least every 24 months in accordance with this section. EXCEPTION: Underground storage tank systems with an approved method of detecting leaks from any component of the system. Tanks shall be emptied of flammable or combustible liquids if required tests are not completed within the specified time. When testing is required, owners or operators shall provide the fire code official with data setting forth the method of testing that is to be used and shall submit the name of a qualified individual who will conduct the test. A testing permit shall be obtained. The method of testing to be used shall consider the effects of temperature, pressure and other variables and shall establish conclusively whether the tank or piping is leaking. Pneumatic testing is prohibited. Devices used for final testing shall be capable of detecting leaks as small as 0.05 gallon per hour. Leaking piping and equipment shall not be used until repaired or replaced. The fire code official is authorized to require that the test be conducted in the code official's presence. " Please provide a copy of either the tank tightness and line leak test results or if a automatic tank gauge system is used please provide the annual calibration test report for that device and the print out showing that the system has passed its leak test. 2205.2.2 Emergency shutoff valves. Automatic emergency shutoff valves required by Section 2206.7.4 shall be checked not less than once per year by manually tripping the hold-open linkage. |
| 08/19/2010 | INSP - FULL | CFUNKE | Approved | 605.6 Unapproved conditions. Open junction boxes and open-wiring splices shall be prohibited. Approved covers shall be provided for all switch and electrical outlet boxes. " Replace the missing cover on the junction box above the rear door and on the light switch. |
| 08/19/2010 | INSP - FULL | CFUNKE | Approved | 703.1 Maintenance. The required fire-resistance rating of fire-resistance-rated construction (including walls, firestops, shaft enclosures, partitions, smoke barriers, floors, fire-resistive coatings and sprayed fire-resistant materials applied to structural members and fire-resistant joint systems) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance-rated assemblies shall be protected by self- or automatic-closing doors of approved construction meeting the fire protection requirements for the assembly. " Repair the hole in the wall in the storage area to prevent the travel of smoke and flame in case of a fire. |