Case: T10DV08066
Case Details
Entered Date:
11/08/2010
Applicant:
CAROUSEL REVOC TR
Description:
Installing window air conditioners in all the units without a permit.
Case Violations
Case Number: T10DV08066
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-COMMERCL
Total Violations: 2
Violation Date | Code Statue |
---|---|
11/29/2010 | T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe. |
11/29/2010 | T.C. Ch. 16, Sec. 16-11(a)(1) The presence and operations of window openings, size and condition of exits, bars, grills, grates covering windows and openings shall allow for safe and rapid egress in emergency situations. At least one window and all doors in living/sleeping rooms in dwelling units must have an operable release mechanism that allows safe and rapid egress without the use of separate tools. |
Outstanding Inspections
Case Number: T10DV08066
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-COMMERCL
Total Outstanding Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/15/2010 | NPO(HC)-COOLING | JVALDEZ | Item closed | |
12/15/2010 | NPO(HC)-HEATING & VENTILATION | JVALDEZ | Item closed |
Completed Inspections
Case Status: COMPLIAN
Case Number: T10DV08066
Case Description: WORK WITHOUT PERMITS-COMMERCL
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/22/2010 | INSP - INITIAL CODE ENFORCMENT | JVALDEZ | Approved | THE BUILDINGS ORIGINAL ROOF TOP HEATING AND COOLING UNITS HAS BEEN REMOVED AND REPLACED WITH AIR CONDITIONING AND HEATING WINDOW MOUNTED UNITS. WIRING METHODS AND CIRCUIT SIZES ARE UNKNOWN. THESE AIR CONDITIONING AND HEATING WINDOW MOUNTED UNITS ARE CURRENTLY BLOCKING THE BEDROOM RAPID EGRESS IN THE VENT OF AN EMERGENCY. |
12/15/2010 | INSP - FOLLOW UP CODE ENFORCE | JVALDEZ | Approved | ALL WINDOW MOUNT UNITS HAVE BEEN REMOVED, OWNER HAS TURN THE ROOF MOUNTED FURNACES. CLOSE CASE |
Completed Activity Special Conditions
Case Description - WORK WITHOUT PERMITS-COMMERCL
Case Number - T10DV08066
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 4
Date | Name |
11/29/2010 | CONTACTED IN PERSON |
11/30/2010 | CONTACTED BY MAILING |
11/30/2010 | NOTICE OF VIOLATION ISSUED |
12/16/2010 | VIOLATION CLOSED |