Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case Details

Status:

COMPLIAN

Type:

WORK WITHOUT PERMITS-RESIDENTL
Address:

Entered Date:

08/25/2010

Applicant:

BRICK TOP LLC ATTN: DAVE FURMARSHKI (AGENT)

Description:

RWOP - Installation of new interior electrical conductors, switches, receptacles, hot water heaters, water supply lines, heating & cooling systems.

Case Violations

Case Number: T10DV05675
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Violations: 2
Violation Date Code Statue
08/27/2010 T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe.
04/19/2011 T.C. Ch. 16, Sec. 16-12(a)(3) BOARDED WINDOW OR DOOR OPENINGS. a. No occupied structure may have boarded window or door openings, except as necessary on a temporary basis to keep the structure secure while under repair. b. While vacant structures may temporarily be secured by boarding up window and door openings in accordance with section 16-14(b), having or maintaining boarded window or door openings on a vacant structure for 180 days or more in any one-year period is prohibited.

Outstanding Inspections

Case Number: T10DV05675
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Outstanding Inspections - 8
End Date Description Inspector Results Comments
12/08/2011 NPO(EL)-MAIN/PANEL/SUB/DISCONT HLOPEZ Follow-up inspection
12/08/2011 NPO(EL)-WIRING/SWITCH/OUTLT/FX HLOPEZ Follow-up inspection
12/08/2011 NPO(PL)-PLUMBING SYSTEM & FX HLOPEZ Follow-up inspection
12/08/2011 NPO(PL)-WATER HEATERS HLOPEZ Follow-up inspection
12/08/2011 NPO(HC)-COOLING HLOPEZ Follow-up inspection
12/08/2011 NPO(HC)-HEATING & VENTILATION HLOPEZ Follow-up inspection
12/08/2011 NPO - BOARDING EXCEEDING 180 D HLOPEZ Follow-up inspection
12/08/2011 NPO - WORK WITHOUT PERMIT HLOPEZ Follow-up inspection

Completed Inspections

Case Status: COMPLIAN
Case Number: T10DV05675
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Completed Inspections - 2
End Date Description Inspector Results Comments
08/19/2010 INSP - INITIAL CODE ENFORCMENT HLOPEZ Approved W/O/P VIOLATION SITE INSPECTION, 1 UNIT OF TRI-PLEX INTERIOR GUTTED, COMPLEX SCHEDULED FOR INTERIOR REMODEL OF ELECTRICAL SYSTEMS, MODIFACATIONS TO PLUMBING SYSTEMS & NEW HEATING & COOLING SYSTEMS. CONTACTED HCD CSR FOR RESEARCH, NO PERMITS ON FILE. CONTACT MADE W/AGENT, REVIEWED ISSUES, AGENT STATED ALL THREE TRIPLEX ARE SCHEDULED FOR REMODEL. STOP WORK ORDER POSTED. RESEARCH REQUIRED PRIOR TO NOV.
12/08/2011 INSP - FOLLOW UP CODE ENFORCE HLOPEZ Approved PERMIT T10CM02454 CURRENT Expires 03/28/12, last inspection 9/30/11, plumbing intermediate, partial approval. Office fw/up to be scheduled in 90 days

Completed Activity Special Conditions

Case Description - WORK WITHOUT PERMITS-RESIDENTL
Case Number - T10DV05675
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 6
Date Name
08/31/2010 CONTACTED BY MAILING
09/16/2010 CERTIFIED RECEIPT CARD
08/27/2010 RESEARCH
05/02/2011 REINSPECTION FEE - FIRST
05/11/2012 REINSPECTION FEE - SECOND
08/27/2010 NOTICE OF VIOLATION ISSUED