Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T10DV05669
Case Details
Entered Date:
08/25/2010
Applicant:
BRICK TOP LLC ATTN: DAVE FURMARSHKI (AGENT)
Description:
RWOP - Installation of new interior electrical conductors, switches, receptacles, hot water heaters, water supply lines, heating & cooling systems.
Case Violations
Case Number: T10DV05669
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Violations: 1
Violation Date | Code Statue |
---|---|
08/27/2010 | T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe. |
Outstanding Inspections
Case Number: T10DV05669
Case Status: COMPLIAN
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Outstanding Inspections - 7
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/07/2010 | NPO(EL)-MAIN/PANEL/SUB/DISCONT | HLOPEZ | Follow-up inspection | |
12/07/2010 | NPO(EL)-WIRING/SWITCH/OUTLT/FX | HLOPEZ | Follow-up inspection | |
12/07/2010 | NPO(PL)-PLUMBING SYSTEM & FX | HLOPEZ | Follow-up inspection | |
12/07/2010 | NPO(PL)-WATER HEATERS | HLOPEZ | Follow-up inspection | |
12/07/2010 | NPO(HC)-COOLING | HLOPEZ | Follow-up inspection | |
12/07/2010 | NPO(HC)-HEATING & VENTILATION | HLOPEZ | Follow-up inspection | |
12/07/2010 | NPO - WORK WITHOUT PERMIT | HLOPEZ | Follow-up inspection |
Completed Inspections
Case Status: COMPLIAN
Case Number: T10DV05669
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/19/2010 | INSP - INITIAL CODE ENFORCMENT | HLOPEZ | Approved | W/O/P VIOLATION SITE INSPECTION, 3 UNITS OF TRI-PLEX INTERIOR HAD BEEN GUTTED, NEW ELECTRICAL CONDUCTORS, SWITCH BOX'S, RECEPTACLES, HARD WIRED SMOKE DETECTORS, GFIC RECEPTACLES, INTERIOR LIGHTING, HOT WATER HEATERS, HOT & COLD COPPER WATER SUPPLY LINES & SPLIT TYPE AIRCONDITIONER HAVE BEEN INSTALLED, MADE CONTACT W/ON-SITE CREW, REQUESTED TO SEE PERMITS, NONE ON SITE, CONTACTED HCD CSR FOR RESEARCH, NO PERMITS ON FILE. CONTACT MADE W/AGENT, REVIEWED ISSUES, AGENT STATED ALL THREE TRIPLEX ARE SCHEDULED FOR REMODEL. STOP WORK ORDER POSTED. RESEARCH REQUIRED PRIOR TO NOV |
12/07/2010 | INSP - FOLLOW UP CODE ENFORCE | HLOPEZ | Approved | COMPLIANCE INSPECTION ALL UNITS OCCUPIED, CK PP FOR INSPECTION, 60 DAY FW/UP SEE CONDITION SCREEN FOR DETAILS |
Completed Activity Special Conditions
Case Description - WORK WITHOUT PERMITS-RESIDENTL
Case Number - T10DV05669
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 7
Date | Name |
08/31/2010 | CONTACTED BY MAILING |
09/16/2010 | CERTIFIED RECEIPT CARD |
11/16/2012 | VIOLATION CLOSED |
08/27/2010 | RESEARCH |
11/01/2011 | REINSPECTION FEE - FIRST |
05/02/2012 | REINSPECTION FEE - SECOND |
08/27/2010 | NOTICE OF VIOLATION ISSUED |