Case: T10DV01649
Case Details
Entered Date:
03/26/2010
Applicant:
CHEMNIC LLC
Description:
Zoned C-1: Excessive amount of storage (construction material) piled at property, which is not screened from public view. Storage unit larger than 200 sq ft and viewable from street.
Case Violations
Case Number: T10DV01649
Case Status: COMPLIAN
Case Description: COMMERCIAL ZONING
Total Violations: 2
| Violation Date | Code Statue |
|---|---|
| 04/15/2010 | UDC, Sec. 10.3.5. VIOLATION OF A SITE PLAN Failure to comply with conditions placed on an approved site plan shall constitute a violation of the UDC. |
| 04/15/2010 | T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe. |
Outstanding Inspections
Case Number: T10DV01649
Case Status: COMPLIAN
Case Description: COMMERCIAL ZONING
Total Outstanding Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/12/2010 | LUC - VIOL OF SITE PLAN - COND | RDIAZ | Item closed | |
| 07/12/2010 | LUC - ZONING OTHER | RDIAZ | Item closed |
Completed Inspections
Case Status: COMPLIAN
Case Number: T10DV01649
Case Description: COMMERCIAL ZONING
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2010 | INSP - INITIAL CODE ENFORCMENT | RVIDAL | Approved | FOUND A METAL CONTAINER ON REAR OF PROPERTY NEXT TO WASH. CONTAINER HAS TEMPORARY CHAIN LINK FENCING AROUND CONTAINER WITH STORAGE OF LEFT OVER CONSTRUCTION MATERIAL AND ITEMS BEING STORED ON SITE. HAS WOOD BEING STORED ON TOP OF METAL CONTAINER. HAS ANOTHER STRUCTURE NEXT TO METAL CONTAINER WHICH TO APPEAR TO BE CONCRETE TILT PANELS. THEY ARE DETTACHED FROM EACH OTHER. I TALK TO THE OWNER OF THE COMPANY AND UNABLE TO PROVIDE A SITE PLAN. HE WAS GOING TO TALK TO BILL BALAK ON WHAT NEEDS TO BE DONE FROM ZONNING AT P.D.S.D. I WILL MEET WITH BILL BALAK. RV |
| 07/12/2010 | INSP - FOLLOW UP CODE ENFORCE | RDIAZ | Approved | 7/12/10 11:50AM, FENCE AROUND THE METAL CONTAINER AND ALL MATERIALS AND GOODS HAVE BEEN REMOVE. TALKED WITH THE OWNER AND HE INDICATED THAT HE DID CALL WILLIAM BALAK AND THE FENCE AND STORAGE WAS WHAT CAUSE THE VIOLATION. VIOLATION HAS BEEN ABATED CLOSE CASE. |
Completed Activity Special Conditions
Case Description - COMMERCIAL ZONING
Case Number - T10DV01649
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 3
| Date | Name |
| 04/15/2010 | CONTACTED BY MAILING |
| 07/13/2010 | VIOLATION CLOSED |
| 04/15/2010 | RESEARCH |