Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case Details

Status:

COMPLETE

Type:

INSPECTION
Address:

Entered Date:

12/29/2009

Applicant:

SPIRIT MASTER FUNDING LLC

Description:

Full Fire Prevention Inspection Building Rep: Monica Sanchez Phone # 888-7444

Outstanding Inspections

Case Number: T09FR03907
Case Status: COMPLETE
Case Description: INSPECTION
Total Outstanding Inspections - 3
End Date Description Inspector Results Comments
12/29/2009 INSP - FULL JLONGO Correction Required Full Fire Prevention Inspection completed. Please correct the following Tucson Fire Code Violations.
12/29/2009 VIOL - FIRE PROTECTION SYSTEMS JLONGO Correction Required 903.3.3 Obstructed locations. Automatic sprinklers shall be installed with due regard to obstructions that will delay activation or obstruct the water distribution pattern. Automatic sprinklers shall be installed in or under covered kiosks, displays, booths, concession stands, or equipment that exceeds 4 feet (1219 mm) in width. Not less than a 3-foot (914 mm) clearance shall be maintained between automatic sprinklers and the top of piles of combustible fibers. _____ The sprinkler head in the restroom is currently being obstructed and shall either be moved to a better location or the door obstructing the head shall be removed or altered to make the sprikler operable.
12/29/2009 VIOL - MEANS OF EGRESS JLONGO Correction Required 1008.1.8 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. 1008.1.8.5 Unlatching. The unlatching of any door or leaf shall not require more than one operation. ______ Remove the drop bar system from your rear egress door. ________________________________________________ (Joseph P. Longo, Inspector, Tucson Fire Department) I, ______________________ have received a copy of this inspection report. (Building Representative) ____________________________ (Captain) Re-inspection scheduled on or after ___/___/___ Call Inspector Longo at 235-4262 or 791-4502, if you have any further questions. Thank you. Re-inspection passed: ___ ___ ___ ___________________ Passed on: ________ (Joseph P. Longo)