Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T09FR03081
Case Details
Entered Date:
09/22/2009
Applicant:
MENLO PARK SHOPPING CENTER COMPANY
Description:
Full Fire Prevention Inspection. Veronica Lozano 740-0290
Outstanding Inspections
Case Number: T09FR03081
Case Status: COMPLETE
Case Description: INSPECTION
Total Outstanding Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/22/2009 | VIOL - MEANS OF EGRESS | JBURGE | Correction Required | IFC 1027.5 Illumination emergency power. The power supply for means of egress illumination shall normally be provided by the premises' electrical supply. In the event of power supply failure, illumination shall be automatically provided from an emergency system. _____1. Test and repair all emergency lighting units located in the builing. |
09/22/2009 | VIOL - MEANS OF EGRESS | JBURGE | Correction Required | IFC 1028.2 Reliability. Required exit accesses, exits or exit discharges shall be continuously maintained free from obstructions or impediments to full instant use in the case of fire or other emergency when the areas served by such exits are occupied. Security devices affecting means of egress shall be subject to approval of the fire code official. _____1. Remove all storage from obstructing the required width of the south exit access. |
Completed Inspections
Case Status: COMPLETE
Case Number: T09FR03081
Case Description: INSPECTION
Total Completed Inspections - 1
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/13/2009 | INSP - FULL | JBURGE | Approved | All noted Tucson Fire Code violations have been corrected. |