Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case Details

Status:

COMPLETE

Type:

INSPECTION
Address:

Entered Date:

07/15/2009

Applicant:

PFERSDORF JAMES E JR & SYLVIA C TR

Description:

Full Fire Prevention Inspection

Outstanding Inspections

Case Number: T09FR02282
Case Status: COMPLETE
Case Description: INSPECTION
Total Outstanding Inspections - 5
End Date Description Inspector Results Comments
INSP - FULL None Not Inspected
07/15/2009 VIOL - PRECAUTION AGAINST FIRE DSIWARSKI Violation IFC.315.2.1 Ceiling clearance. Storage shall be maintained 2 feet (610 mm) or more below the ceiling in nonsprinklered areas of buildings or a minimum of 18 inches (457 mm) below sprinkler head deflectors in sprinklered areas of buildings. ____Unsprinklered buildings, shall have a two feet clearance between combustible materials and the ceiling.
07/15/2009 VIOL - BUILDING SVCS & SYSTEMS DSIWARSKI Violation IFC.605.5 Extension cords shall not be used as permanent wireing by micro wave and office (owner). ___Remove extension cords.
07/15/2009 VIOL - COMPRESSED GASES DSIWARSKI Violation IFC.3003.5.3 Securing compressed gas containers, cylinders and tanks. Securing compressed gas containers, cylinders and tanks. Compressed gas containers, cylinders and tanks shall be secured to prevent falling caused by contact, vibration or seismic activity... ___Secure compressed gas cylinder.
08/03/2009 VIOL - MEANS OF EGRESS DSIWARSKI Violation IFC.1006.1 Illumination required. The means of egress, including the exit discharge, shall be illuminated at all times the building space served by the means of egress is occupied. ____Illumination of egress path shall be required.